News Releases
Saskatoon Fire - News Releases
Saskatoon Transit and Access Transit services are experiencing delays due to snow accumulation
November 24, 2024 - 8:13am
Saskatoon Transit is operating today; however, customers are advised to expect delays of up to 20 minutes or longer for fixed-route service. Due to deep snow accumulation on the roads, bus operators may stop in the driving lane to pick up passengers and not pull into bus stops to avoid getting stuck.
Several detours are in place already this morning around streets where there’s a risk of a bus getting stuck. These are identified as Snow Event Detours in service alert messages.
Stay informed with the real-time mobile apps, transit and Google or visit saskatoontransit.ca/service-alerts for updates on routes that are delayed longer than 20 minutes and for Snow Event Detours. If you can’t use these tools, please call our customer service centre at 306-975-3100 an hour before your trip for an update.
Access Transit
Access Transit customers are strongly encouraged to reschedule non-urgent trips today and Monday. A trip may be cancelled if the street or sidewalk/path to the pick-up location is full of snow, for the safety of the customer and operator.
Customers should also prepare for delays as operators navigate traffic and road conditions. In the event a paratransit bus gets stuck in deep snow, onboard customers will be required to wait.
Customer service phone lines are busy for both Access Transit and fixed-route and extra staff is on hand to handle calls as quickly as possible.
Keeping all transit services operational during snow events is a key priority, and we are committed to helping residents get where they need to go safely. Thank you for your patience and understanding as our frontline employees navigate this busy, snow day.
Snow Event #2: Snow clearing and road safety in Saskatoon
November 24, 2024 - 7:19am
- Snow Clearing in Progress: Snow crews are focused on priority streets, including Circle Drive, major roadways, bridge decks and intersections. Sanding is being done to improve traction.
- Additional Measures: We are monitoring conditions closely and may activate the Roadways Emergency Response Plan (ERP) if snow accumulation reaches 25 cm this weekend and light vehicles can no longer navigate City streets.
- What’s Next: More snow is expected throughout Sunday. Crews will continue working around the clock to address accumulation and drifting.
- Avoid Non-Essential Travel: Try to stay at home if you can and avoid travel so crews can keep clearing the snow. If you must drive, ensure your vehicle is equipped with winter tires and allow extra time to reach your destination safely.
- Help Crews Work Efficiently: Avoid parking on priority streets where snow clearing equipment is active.
Saskatoon’s snowfall accumulation is approximately 20 centimetres since Saturday afternoon, with Environment and Climate Change Canada forecasting up to 30 centimetres of total accumulation by the end of this weekend. City and contractor crews completed the priority street snow grading from the first snow event of the season just in time to begin responding to the second big snowfall.
What you can expect from us
How you can help us
Once the snow stops falling, the status of snow clearing throughout the city can be monitored through the Priority Street Snow Grading Map. Learn about winter road maintenance at saskatoon.ca/snow. Stay in the know by checking the latest Snow & Ice Report posted to saskatoon.ca/SnowReport.
Update: Warman Rd access ramps to Circle Dr westbound reopen, Millar Ave closed at Circle Drive
November 23, 2024 - 10:25am
Warman Road access ramps to Circle Drive westbound reopened this morning to traffic after being closed overnight. Millar Avenue is now closed at 43rd Street in all directions as City crews repair a watermain at the intersection. There is no access to Millar Avenue from Circle Drive and patrons of businesses in the area are detoured to the Circle Drive entrance.
Water is turned off for local businesses during the repair. The repair work is expected to take one day to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
The City thanks everyone for their patience.
Warman Road access ramps to Circle Drive westbound closed due to flooding
November 22, 2024 - 10:59pm
The northbound and southbound Warman Road access ramps to Circle Drive westbound and the outside lane on Circle Drive westbound east of Millar Avenue are closed due to major ice from a watermain break Friday evening.
A watermain break on Millar Avenue at 43rd Street caused flooding in the area for several hours that froze as temperatures dropped. City crews have the water turned off and will address the ice before reopening the roads for traffic.
Drivers should avoid this area or expect delays. Additional traffic restrictions will be posted once the repair is scheduled. Businesses in the area that will be affected by a water outage will receive information about a Drinking Water Advisory.
The public will be notified with another PSA when these restrictions are lifted. The City thanks everyone for their patience.
Daily Road Report - November 25, 2024
November 22, 2024 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
29TH ST W ROAD CLOSED FROM IDYLWYLD DR N TO AVE B N
(Service connection replacements)
Start: November 25, 7:00 a.m. End: November 26, 5:00 p.m.
ONGOING
24TH ST E WB LANES CLOSED FROM 6TH AVE N TO 5TH AVE N
(SL&P construction)
Start: August 7, 8:00 a.m. End: November 27, 5:00 p.m.
4TH AVE N NB CURB LANE CLOSED FROM 22ND ST E TO 23RD ST E
(Vault repairs)
Start: September 16, 7:00 a.m. End: November 29, 4:00 p.m.
8TH ST E ROAD CLOSED FROM MCORMOND DR TO ZIMMERMAN RD
(Road construction)
No access to Zimmerman Rd from 8th St
Start: June 10, 7:00 a.m. End: December 6, 5:00 p.m.
19TH ST E EB CURB LANE CLOSED FROM 2ND AVE S TO 3RD AVE S
(Construction)
Start: November 19, 7:00 a.m. End: December 11, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM TASKAMANWA ST TO 8TH ST E
(Construction)
Use McOrmond Dr
Start: November 20, 2023, 7:00 a.m. End: September 26, 2025, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Weekend Road Report - November 23-24, 2024
November 22, 2024 - 2:30pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
ONGOING
24TH ST E WB LANES CLOSED FROM 6TH AVE N TO 5TH AVE N
(SL&P construction)
Start: August 7, 8:00 a.m. End: November 27, 5:00 p.m.
4TH AVE N NB CURB LANE CLOSED FROM 22ND ST E TO 23RD ST E
(Vault repairs)
Start: September 16, 7:00 a.m. End: November 29, 4:00 p.m.
8TH ST E ROAD CLOSED FROM MCORMOND DR TO ZIMMERMAN RD
(Road construction)
No access to Zimmerman Rd from 8th St
Start: June 10, 7:00 a.m. End: December 6, 5:00 p.m.
19TH ST E EB CURB LANE CLOSED FROM 2ND AVE S TO 3RD AVE S
(Construction)
Start: November 19, 7:00 a.m. End: December 11, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM TASKAMANWA ST TO 8TH ST E
(Construction)
Use McOrmond Dr
Start: November 20, 2023, 7:00 a.m. End: September 26, 2025, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
City of Saskatoon ready for anticipated weekend snowfall
November 22, 2024 - 1:30pm
Environment and Climate Change Canada is forecasting 10 to 20 cm of snowfall this weekend, and the City is fully prepared to respond. Snowfall of more than five cm can significantly impact driving conditions, creating slick, snow-covered roads and reduced visibility, while increasing the chances of vehicles getting stuck. Crews will work to keep roadways as safe and passable as possible.
“We are monitoring the forecast, and are prepared to act,” says Goran Saric, Director of Roadways, Fleet and Support. “We will focus on keeping Circle Drive and other major routes clear during the snowfall while addressing icy spots with sand and salt. Once the snow stops, a coordinated cleanup effort will be launched on priority streets.”
The City’s Snow Event process will activate if five or more centimetres of snow accumulates. Additional contractor graders will join City crews to clear freeways, arterial roads and collector streets. Snow will be stored on medians, boulevards and parking lanes to maintain road capacity. Local or neighbourhood streets are not included in regular snow grading and maintenance.
Driving conditions will likely be challenging during and after the snowfall. Residents are urged to adjust their driving habits by slowing down, increasing following distances and watching for blue and amber flashing lights on snow-clearing equipment.
“All critical infrastructure service providers—including emergency workers --are prepared to ensure these services continue,” says Pamela Goulden-McLeod, Director of Emergency Management Organization.
“We ask residents to prepare to stay at home as much as possible on Saturday afternoon and Sunday morning to allow roadways crews to work and to help emergency vehicles get around. If you have to travel, please check the highway hotline prior to heading out of town. And please – let’s continue to help out family, friends and neighbours as we always do.”
Transit service will remain operational; however, service can be delayed or interrupted by collisions, blown-in streets and bus stops that are not accessible from snowfall and drifts. The priority snow grading system accounts for all bus routes; however, it can take a few days to get them all cleared.
“We’re prepared to offer full service, although we encourage riders to check for service alerts before heading out and to dress warmly in case they have a longer wait at a stop,” says Mike Moellenbeck, Director of Saskatoon Transit. “The buses can experience the same delays as everyone else when there are collisions and heavy snow drifts.”
For updates check the real-time mobile app, transit or visit saskatoontransit.ca/service-alerts.
The status of snow clearing throughout the City can be monitored through the Priority Street Snow Grading Map. Learn about winter road maintenance at saskatoon.ca/snow. Stay in the know by checking the latest Snow & Ice Report posted to saskatoon.ca/SnowReport.
Saskatoon’s 2024-2028 City Council was sworn in yesterday, November 20
November 21, 2024 - 3:30pm
Saskatoon’s 2024-2028 City Council was sworn in yesterday, November 20, 2024, in Council Chambers.
Eleven Council members, comprised of one mayor and 10 councillors, took their oaths before their family, dignitaries and members of City administration.
The ceremony included the 2024 Local Government Elections Returning Officer’s Declaration of Results, and appointment of Deputy Mayors and members of the Standing Policy Committees for November and December 2024.
Mayor Cynthia Block presented her Inaugural Address, along with remarks from Elders Nora Cummings, Métis Senator and Roland Duquette, Mistawasis Nêhiyawak.
You can watch the full video replay of the event available from the City’s website.
The 2024-2028 Saskatoon City Council members are:
Mayor- Cynthia BLOCK
Ward 1 Councillor Kathryn MACDONALD
Ward 2 Councillor Senos TIMON
Ward 3 Councillor Robert PEARCE
Ward 4 Councillor Troy DAVIES
Ward 5 Councillor Randy DONAUER
Ward 6 Councillor Jasmin PARKER
Ward 7 Councillor Holly KELLEHER
Ward 8 Councillor Scott FORD
Ward 9 Councillor Bev DUBOIS
Ward 10 Councillor Zach JEFFRIES
City Council orientation took place this week on November 18 and 19. The next Regular Business and Public Hearing meetings of City Council are on Wednesday, November 27.
The City’s website saskatoon.ca will be updated next week to include new Council information and how to contact Saskatoon’s 2024-2028 Council Members.
Daily Road Report - November 22, 2024
November 21, 2024 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
11TH ST W WB RIGHT TURN LANE CLOSED AT FAIRLIGHT DR
(Roadwork)
Start: November 22, 8:00 a.m. End: November 22, 4:30 p.m.
RUTH ST E EB LANES CLOSED FROM ROYAL AVE TO BROADWAY AVE
(Tree trimming)
Two-way traffic will be maintained in WB lanes
Start: November 22, 9:00 a.m. End: November 22, 4:00 p.m.
4TH AVE N SB CURB LANE CLOSED FROM 24TH ST E TO 23RD ST E
(Underground maintenance)
Start: November 22, 9:00 a.m. End: November 22, 5:00 p.m.
8TH ST E EB RIGHT TURN LANE CLOSED AT CIRCLE DR E
(Manhole inspection)
Start: November 22, 10:00 a.m. End: November 22, 2:00 p.m.
ONGOING
8TH ST E WB LANES CLOSED AT MCORMOND DR
(Intersection construction)
Two-way traffic will be maintained in EB lanes
Start: September 23, 7:00 a.m. End: November 22, 4:30 p.m.
24TH ST E WB LANES CLOSED FROM 6TH AVE N TO 5TH AVE N
(SL&P construction)
Start: August 7, 8:00 a.m. End: November 27, 5:00 p.m.
4TH AVE N NB CURB LANE CLOSED FROM 22ND ST E TO 23RD ST E
(Vault repairs)
Start: September 16, 7:00 a.m. End: November 29, 4:00 p.m.
8TH ST E ROAD CLOSED FROM MCORMOND DR TO ZIMMERMAN RD
(Road construction)
No access to Zimmerman Rd from 8th St
Start: June 10, 7:00 a.m. End: December 6, 5:00 p.m.
19TH ST E EB CURB LANE CLOSED FROM 2ND AVE S TO 3RD AVE S
(Construction)
Start: November 19, 7:00 a.m. End: December 11, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM TASKAMANWA ST TO 8TH ST E
(Construction)
Use McOrmond Dr
Start: November 20, 2023, 7:00 a.m. End: September 26, 2025, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Bus service to FIBA Men’s Americup 2025
November 21, 2024 - 6:00am
- 5:45 p.m.
- 6:25 p.m.
- 12:45 p.m.
- 1:25 p.m.
Direct service from the Special Events Stop (23rd Street and 2nd Avenue) to the FIBA Men’s Americup 2025 at SaskTel Centre on Thursday, November 21 starting at 7:00 p.m., is available at the following times:
Direct service from the Special Events Stop to the FIBA Men’s Americup 2025 at SaskTel Centre on Sunday, November 24 starting at 2:00 p.m., is available at the following times:
Post-event drop-off is at the downtown terminal and regular fares apply ($3.00 per trip). Fare can be purchased on your mobile phone using either the TGo or transit app, transfers and passes are also accepted. Typically, buses arrive onsite 30 minutes prior to the end of the event.
Plan your trip to events at SaskTel Centre on Route 333 using the Transit app up to two weeks in advance. Check out the Transit+ feature to help make connections that combine Transit with OnDemand Transit, riide, and Uber. Download the Transit app from the Apple Store or Google Play.
Transit service times for special events at SaskTel Centre and other popular destinations can always be found at SaskatoonTransit.ca/plan-my-trip/popular-destinations. Experience the convenience of using Saskatoon Transit to attend all your favourite events.