Daily Road Report - April 29, 2025
April 28, 2025 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
ASSINIBOINE DR ROAD CLOSED FROM CAPILANO DR TO CHURCHILL DR
(Catch basin work)
Start: April 29, 9:00 a.m. End: April 29, 7:00 p.m.
VICTORIA AVE NB & SB DRIVING LANES CLOSED FROM ISABELLA ST E TO WILLOW ST E
(Sanitary sewer lining)
Two-way traffic will be maintained in parking lanes
Start: April 29, 10:00 a.m. End: April 29, 2:00 p.m.
11TH ST W EB LANES CLOSED FROM AVE W S TO AVE U S
(Environmental drilling)
Two-way traffic will be maintained in WB lanes
Start: April 29, 12:00 p.m. End: May 2, 5:00 p.m.
ONGOING
CIRCLE DR W NB & SB MEDIAN LANES CLOSED FROM CLANCY DR TO AIRPORT DR
(Median sweeping)
Start: April 28, 8:00 p.m. End: April 29, 6:00 a.m.
AVE W S SB LANES & EB CURB LANE CLOSED AT 11TH ST W
(Drilling)
Start: April 25, 7:00 a.m. End: April 29, 12:00 p.m.
24TH ST E WB LANES CLOSED FROM SPADINA CRES E TO 5TH AVE N
(Construction)
Start: April 28, 9:00 a.m. End: May 11, 5:00 p.m.
BERINI DR SB CURB LANE CLOSED FROM ATTRIDGE DR TO WEBSTER ST
(Construction)
Start: March 17, 7:00 a.m. End: May 19, 5:00 p.m.
CIRCLE DR W SB SHOULDER CLOSED; SPEED REDUCTION FROM GLENWOOD AVE TO 33RD ST W
(Jersey barrier placement)
Start: April 28, 7:00 a.m. End: June 2, 4:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM TASKAMANWA ST TO 8TH ST E
(Construction)
Use McOrmond Dr
Start: November 20, 7:00 a.m. End: September 26, 2025, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Reminder: Permits Required for Park Access
April 28, 2025 - 10:00am
- Complete the Request Access to a Park online form at saskatoon.ca/parkaccess;
- Complete the Request City Utility Line Locate online form at Locating Underground Utilities | Saskatoon.ca or Sask 1st - Call Before You Dig
- Call Parks Customer Service at 306-975-3300.
- Repairing any damage to City property at the homeowner's/contractor’s expense. As per Bylaw 7767 there are fines associated with park damage.
- Removing all litter/debris after the project is complete.
- Expenses incurred by the City to repair damage.
- Adhering to any restrictions set forth in the approval process, including limitations for vehicle access when the turf is wet.
- Accepting liability for any injury to the public, and for damages to public property.
- Contacting the Parks Department after the work is complete for an inspection and to close the permit.
Spring is a busy time of year for projects in the yard, garden, and around the home. Contractors and homeowners with a property adjacent to a park may wish to use the park as an access point for deliveries, equipment and/or vehicles related to their projects.
The City would like to remind contractors and homeowners about the importance of gaining approval prior to using the park space, park linkage, greenspace or bufferstrips as an access point for deliveries, equipment and/or vehicles to ensure the safety and enjoyment of these spaces for everyone.
To obtain a permit, contractors and homeowners are required to:
Permit applications should be submitted at least one week prior to the date required.
Once the permit has been issued, the permit holder is responsible for:
For more information, or to request a Park Access Permit for your project, call 306‑975‑3300 or visit saskatoon.ca/parkaccess.
City to lower flags in recognition of National Day of Mourning
April 28, 2025 - 7:00am
The National Day of Mourning is observed annually on April 28. In recognition, flags at all City of Saskatoon facilities will fly at half-mast for the day.
The National Day of Mourning was officially recognized by the federal government in 1991 and commemorates workers who have been killed, injured or suffered illness due to workplace-related hazards and incidents. It’s also a day to collectively renew our commitment to improving health and safety in the workplace and to preventing further injuries, illnesses and deaths.
The City of Saskatoon is committed to safety in all we do. The National Day of Mourning is an opportunity to create important awareness about workplace safety and our organization’s commitment to ensure every employee goes home safe and healthy at the end of every workday.
Bus service to Bush
April 28, 2025 - 6:00am
- 5:45 p.m.
- 6:25 p.m.
Direct service from the Special Events Stop (23rd Street and 2nd Avenue) to see Bush at SaskTel Centre on Monday, April 28 at 7:00 p.m., is available at the following times:
Post-event drop-off is at the downtown terminal and regular fares apply ($3.00 per trip). Fare can be purchased on your mobile phone using either the TGo or transit app, transfers and passes are also accepted. Typically, buses arrive onsite 30 minutes prior to the end of the event.
Plan your trip to events at SaskTel Centre on Route 333 using the Transit app up to two weeks in advance. Check out the Transit+ feature to help make connections that combine Transit with OnDemand Transit, riide, and Uber. Download the Transit app from the Apple Store or Google Play.
Transit service times for special events at SaskTel Centre and other popular destinations can always be found at SaskatoonTransit.ca/plan-my-trip/popular-destinations. Experience the convenience of using Saskatoon Transit to attend all your favourite events.
Daily Road Report - April 28, 2025
April 25, 2025 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
5TH AVE N ROAD CLOSED FROM 25TH ST E TO 26TH ST E
(Construction work)
Start: April 28, 6:30 a.m. End: May 2, 6:30 p.m.
CIRCLE DR W SB SHOULDER CLOSED; SPEED REDUCTION FROM GLENWOOD AVE TO 33RD ST W
(Jersey barrier placement)
Start: April 28, 7:00 a.m. End: June 2, 4:00 p.m.
IDYLWYLD DR N NB CURB LANE CLOSED FROM 25TH ST E TO 27TH ST W
(Underground maintenance work)
Start: April 28, 9:00 a.m. End: April 28, 3:00 p.m.
RUSSELL RD ROAD CLOSED AT ROBORECKI CRES
(Roadway patching)
Start: April 28, 9:00 a.m. End: April 28, 3:00 p.m.
24TH ST E WB LANES CLOSED FROM SPADINA CRES E TO 5TH AVE N
(Construction)
Start: April 28, 9:00 a.m. End: May 11, 5:00 p.m.
NIGHTWORK
CIRCLE DR W NB & SB MEDIAN LANES CLOSED FROM CLANCY DR TO AIRPORT DR
(Median sweeping)
Start: April 28, 8:00 p.m. End: April 29, 6:00 a.m.
ONGOING
AVE W S SB LANES & EB CURB LANE CLOSED AT 11TH ST W
(Drilling)
Start: April 25, 7:00 a.m. End: April 29, 12:00 p.m.
BERINI DR SB CURB LANE CLOSED FROM ATTRIDGE DR TO WEBSTER ST
(Construction)
Start: March 17, 7:00 a.m. End: May 19, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM TASKAMANWA ST TO 8TH ST E
(Construction)
Use McOrmond Dr
Start: November 20, 7:00 a.m. End: September 26, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Weekend Road Report - April 26-27, 2025
April 25, 2025 - 2:30pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
NEAULT RD SB LANES CLOSED AT 33RD ST W
(Construction)
Traffic will be maintained in the NB lanes
Start: April 26, 7:00 a.m. End: April 26, 9:00 a.m.
33RD ST E ROAD CLOSED FROM 6TH AVE N TO 7TH AVE N
(Valve replacement work)
Start: April 26, 8:00 a.m. End: April 26, 5:00 p.m.
33RD ST W EB & WB MEDIAN LANES CLOSED FROM AVE E N TO AVE F N
(Sewer main lining)
Start: April 26, 9:00 a.m. End: April 26, 1:00 p.m.
33RD ST W NB MEDIAN LANE CLOSED FROM AVE C N TO IDYLWYLD DR N
(Sewer main lining)
Start: April 26, 11:00 a.m. End: April 26, 5:00 p.m.
CIRCLE DR E WB MEDIAN LANE CLOSED FROM 1ST AVE N TO FAITHFULL AVE
(Streetlight pole replacement)
Start: April 27, 6:00 a.m. End: April 27, 8:00 a.m.
CIRCLE DR E EB & WB CURB LANES CLOSED FROM ALBERTA AVE TO MILLAR AVE
(Streetlight pole replacement)
Start: April 27, 6:00 a.m. End: April 27, 2:00 p.m.
ONGOING
20TH ST W ROAD CLOSED FROM AVE S S TO AVE T S
(Water and sewer connection work)
Start: April 21, 7:00 a.m. End: April 27, 6:00 p.m.
AVE W S SB LANES & EB CURB LANE CLOSED AT 11TH ST W
(Drilling)
Start: April 25, 7:00 a.m. End: April 29, 12:00 p.m.
BERINI DR SB CURB LANE CLOSED FROM ATTRIDGE DR TO WEBSTER ST
(Construction)
Start: March 17, 7:00 a.m. End: May 19, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM TASKAMANWA ST TO 8TH ST E
(Construction)
Use McOrmond Dr
Start: November 20, 7:00 a.m. End: September 26, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
5th Avenue closed between 25th and 26th streets starting Monday
April 25, 2025 - 1:52pm
5th Avenue will be closed between 25th and 26th streets starting Monday, April 28 at 6:30 a.m. for construction work. Detours will be in place guiding motorists around the work zone. This project is expected to take five days to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
33rd Street East closed between 6th and 7th avenues on Saturday
April 25, 2025 - 1:01pm
33rd Street East will be closed between 6th and 7th avenues on Saturday, April 26, starting at 8:00 a.m. for valve replacement work. Detours will be in place guiding motorists around the work zone. This project is expected to take one day to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Bus service to Rush vs Swarm playoffs
April 25, 2025 - 1:00pm
- 6:15 p.m.
- 6:55 p.m.
Direct service from the Special Events Stop (23rd Street and 2nd Avenue) to watch the Saskatchewan Rush take on the Georgia Swarm at SaskTel Centre in a quarterfinal playoff game on Saturday, April 26 at 7:30 p.m., is available at the following times:
Post-event drop-off is at the downtown terminal and regular fares apply ($3.00 per trip). Fare can be purchased on your mobile phone using either the TGo or transit app, transfers and passes are also accepted. Typically, buses arrive onsite 30 minutes prior to the end of the event.
Plan your trip to events at SaskTel Centre on Route 333 using the Transit app up to two weeks in advance. Check out the Transit+ feature to help make connections that combine Transit with OnDemand Transit, riide, and Uber. Download the Transit app from the Apple Store or Google Play.
Transit service times for special events at SaskTel Centre and other popular destinations can always be found at SaskatoonTransit.ca/plan-my-trip/popular-destinations. Experience the convenience of using Saskatoon Transit to attend all your favourite events.
Daily Road Report - April 25, 2025
April 24, 2025 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
TAYLOR ST E ROAD CLOSED FROM LANSDOWNE AVE TO HANOVER AVE
(Water main repairs)
Start: April 25, 8:00 a.m. End: April 25, 6:00 p.m
IDYLWYLD DR NB & SB LANE RESTRICTIONS BETWEEN SID BUCKWOLD BRIDGE & CLARENCE AVE
(Litter pickup)
Start: April 25, 9:00 a.m. End: April 25, 3:00 p.m.
ONGOING
20TH ST W ROAD CLOSED FROM AVE S S TO AVE T S
(Water and sewer connections)
Start: April 21, 7:00 a.m. End: April 27, 6:00 p.m.
BERINI DR SB CURB LANE CLOSED FROM ATTRIDGE DR TO WEBSTER ST
(Construction)
Start: March 17, 7:00 a.m. End: May 19, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM TASKAMANWA ST TO 8TH ST E
(Construction)
Use McOrmond Dr
Start: November 20, 7:00 a.m. End: September 26, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Taylor Street closed between Lansdowne and Hanover avenues on Friday
April 24, 2025 - 1:45pm
Taylor Street will be closed between Lansdowne and Hanover avenues on Friday, April 25, starting at 8:00 a.m. for water main repairs. Detours will be in place guiding motorists around the work zone. This project is expected to take one day to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Pavement markings get fresh coat of paint
April 24, 2025 - 7:00am
Crews have started repainting pavement markings to ensure we can all safely get around our city.
Pavement marking work started earlier this month with repainting crosswalks in school zones and residential neighbourhoods.
In the coming weeks, crews will be out refreshing pavement markings such as traffic lane lines, edge lines, centre lines, arrows and cycling symbols.
Please use caution and take care when you encounter a painting crew on the road. They’re not blocking your path – they’re making a safer one. Let’s do our part to keep them safe, too, and respect work zones.
To learn more about pavement markings in Saskatoon, visit saskatoon.ca/LinePaint.
Traffic signals restored at intersection of 22nd Street and Diefenbaker Drive
April 23, 2025 - 4:15pm
Traffic signals at 22nd Street West and Diefenbaker Drive have been repaired and are functioning normally. A motor vehicle collision earlier today caused a traffic signal outage at the intersection.
Thank you for your patience and cooperation while crews worked to restore the traffic lights.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Daily Road Report - April 24, 2025
April 23, 2025 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
RUTH ST E SB LANES CLOSED FROM DUFFERIN AVE TO HANOVER AVE
(Sanitary sewer lining)
Start: April 24, 8:00 a.m. End: April 24, 12:00 p.m.
25TH ST E EB & WB MEDIAN LANES CLOSED FROM SPADINA CRES E TO 6TH AVE N
(Streetlight pole replacements)
Start: April 24, 9:00 a.m. End: April 24, 1:00 p.m.
33RD ST W EB & WB DRIVING LANES CLOSED FROM AVE H N TO AVE I N
(Sanitary sewer lining)
Traffic will be moved into the parking lanes
Start: April 24, 9:00 a.m. End: April 24, 1:00 p.m.
33RD ST W EB LANES CLOSED FROM STEEVES AVE TO BYNG AVE
(Catch basin repairs)
Start: April 24, 11:00 a.m. End: April 24, 2:00 p.m.
33RD ST W WB LANES CLOSED FROM STEEVES AVE TO CHYNOWETH MEWS
(Catch basin repairs )
Start: April 24, 1:00 p.m. End: April 24, 4:00 p.m.
ONGOING
CONFEDERATION DR VARIOUS NB & SB LANES CLOSED AT 33RD ST W
(Environmental monitoring)
Pilot truck used for this mobile work
Start: April 23, 9:00 a.m. End: April 24, 1:00 p.m.
20TH ST W ROAD CLOSED FROM AVE S S TO AVE T S
(Water and sewer Connections)
Start: April 21, 7:00 a.m. End: April 27, 6:00 p.m.
BERINI DR SB CURB LANE CLOSED FROM ATTRIDGE DR TO WEBSTER ST
(const)
Start: March 17, 7:00 a.m. End: May 19, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM TASKAMANWA ST TO 8TH ST E
(Construction)
Use McOrmond Dr
Start: November 20, 7:00 a.m. End: September 26, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Council approves shift to SK Recycles-led programs in 2028
April 23, 2025 - 1:00pm
Saskatoon City Council today approved making a formal written submission to SK Recycles (formerly Multi-Material Stewardship Western), the provincial stewardship agency, signaling intent to participate in their SK Recycles-led collection models. Starting in January 2028, SK Recycles will deliver both the curbside and multi-unit residential recycling programs for the City of Saskatoon. This will allow time to transition the funding model for waste services that had previously been supported by SK Recycles funding. The change is not expected to cause disruption to the service level for residents.
The decision follows a formal offer from SK Recycles to transition to its new Extended Producer Responsibility (EPR) household recycling program. In May 2024, the Government of Saskatchewan Ministry of Environment approved the Household Packaging and Paper Stewardship Program Regulations, appointing SK Recycles to take over municipal recycling programs.
A report to the April 1 meeting of the Environment, Utilities and Corporate Services Committee (EU&CS) provided a detailed analysis of the options available to the City. Due to considerations such as existing contractual requirements for blue carts and compost depots, Administration recommended and City Council approved maintaining the status quo while Administration works with SK Recycles and recycling service providers to explore an interim agreement that could see the City join earlier as a collector.
Residents will learn more about the service-provider change in the months leading up to the 2028 SK Recycles implementation. By 2028, all Saskatchewan communities will have the option to transition to a full Extended Producer Responsibility program for household packaging and paper, joining the SK Recycles program.
Parks staff conducting prescribed fires in naturalized park areas today
April 23, 2025 - 12:00pm
- Small areas of land are burned during a fire, so only portions of a park are blackened at any given time
- The surrounding area may experience some smoke
- Shrubs and trees are not burned and therefore are not negatively impacted
- Vigorous new growth occurs in the spring which is appreciated by wildlife
- The reduction in accumulated dead plant material provides protection against accidental wildfires
Parks staff in consultation with the Meewasin Valley Authority and the Saskatoon Fire Department, will be performing brief, small-scale prescribed fires in the naturalized areas within Heritage Park today and, weather permitting, Donna Birkmaier Park tomorrow. This initiative is part of the City’s overall strategy to enhance and conserve the biodiversity of naturalized areas in Saskatoon parks.
A prescribed fire is the planned and controlled application of fire to a defined area of land. Prescribed fires replicate the natural renewal process of grasslands, reduce the risk of wildfire and enhance habitat for wildlife.
Prescribed fires are performed by trained Parks staff, and the Saskatoon Fire Department is either on-site or on call to help manage the fire if needed. Prescribed fires are a common, cost-effective park management practice in many cities across Canada and the United States and have been conducted safely for many years.
Timing of the prescribed fires will be determined by weather and wind conditions and residents will be notified via the City’s service alerts and social media channels. Signage will also be placed at the location of the fire to alert park visitors.
The City asks residents for their cooperation at the time of a prescribed fire by respecting work zones and ensuring dogs are leashed when walking through the parks.
The following can be expected during and after a prescribed fire:
For more information on the City’s Prescribed Fire Program, visit saskatoon.ca/prescribedfires.
Take Saskatoon Transit for free to the polls on April 28
April 23, 2025 - 11:00am
To help reduce transportation barriers to voting polls for the federal election, Saskatoon Transit will provide a special pass for free transit service on April 28, 2025. This free service allows everyone to reach their polling station conveniently and affordably.
Find the free pass at saskatoontransit.ca or pick one up at the Transit Customer Service Centre, City Hall, Civic Leisure Centres or a Saskatoon Public Library. A printed pass is not required; electronic versions on mobile phones will be accepted. Just show the pass to the operator when boarding.
The pass is only valid on federal election day, April 28. It can be used multiple times on fixed-route, OnDemand, and Access Transit and will expire at the end of service.
Trips can be planned using the mobile app Transit or Google Maps Transit in advance to help find the best route to a polling station.
For more information about free election day transit service, visit saskatoontransit.ca.
Traffic lights out at intersection of 22nd Street and Diefenbaker Drive
April 23, 2025 - 9:12am
The intersection of 22nd Street West and Diefenbaker Drive is operating as an all-way stop following a collision this morning that caused a traffic signal outage. The all-way stop is in effect until the electronic system that operates the signals can be repaired.
Thank you for your patience and cooperation. Please use caution and take care when passing workers.
Saskatoon Transit may be affected by this traffic delay. Transit service alerts and real-time bus information are available on the Transit app.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Daily Road Report - April 23, 2025
April 22, 2025 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
CONFEDERATION DR VARIOUS NB & SB LANES CLOSED AT 33RD ST W
(Environmental monitoring)
Pilot truck used for this mobile work
Start: April 23, 9:00 a.m. End: April 24, 1:00 p.m.
33RD ST W EB & WB MEDIAN LANES CLOSED FROM HOWELL AVE TO AVE P N
(Sewer lining)
Start: April 23, 10:00 a.m. End: April 23, 2:00 p.m.
33RD ST W EB & WB MEDIAN LANES CLOSED FROM AVE P N TO EDMONTON AVE
(Sewer lining)
Start: April 23, 10:00 a.m. End: April 23, 2:00 p.m.
ONGOING
20TH ST W ROAD CLOSED FROM AVE S S TO AVE T S
(Water and sewer Connections)
Start: April 21, 7:00 a.m. End: April 27, 6:00 p.m.
BERINI DR SB CURB LANE CLOSED FROM ATTRIDGE DR TO WEBSTER ST
(Construction)
Start: March 17, 7:00 a.m. End: May 19, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM TASKAMANWA ST TO 8TH ST E
(Construction)
Use McOrmond Dr
Start: November 20, 7:00 a.m. End: September 26, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
City of Saskatoon golf courses will open on Friday, April 25, 2025
April 22, 2025 - 11:00am
- Holiday Park Golf Course (Phone: 306-975-3325, 1630 Avenue U South)
- Silverwood Golf Course (Phone: 306-975-3314; 3503 Kinnear Avenue)
- Wildwood Golf Course (Phone: 306-975-3320, 4050 8th Street East)
The City of Saskatoon is ready to welcome golfers to Holiday Park, Wildwood, and Silverwood golf courses beginning at 8:00 a.m. on Friday, April 25. Tee time reservations are being accepted by phone, online at saskatoon.ca/golf or in person at the pro shops beginning Wednesday, April 23 at 8:00 a.m.
Starting Saturday, April 26 tee times will begin at 6:00 a.m., daily.
The driving ranges at Holiday Park and Silverwood are currently open from 9:00 a.m. to 7:00 p.m., daily.
Daily Road Report - April 22, 2025
April 17, 2025 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
HART RD EB LANES CLOSED FROM BOWLT CRES TO 22ND ST W
(Streetlight replacement)
Start: April 22, 9:00 a.m. End: April 22, 11:00 a.m.
CIRCLE DR S WB CURB & CENTER LANES CLOSED FROM ST HENRY AVE TO SPADINA CRES W
(Pole replacement)
Start: April 22, 9:00 a.m. End: April 22, 12:00 p.m.
ONGOING
20TH ST W ROAD CLOSED FROM AVE S S TO AVE T S
(Water and sewer connections)
Start: April 21, 7:00 a.m. End: April 27, 6:00 p.m.
BERINI DR SB CURB LANE CLOSED FROM ATTRIDGE DR TO WEBSTER ST
(Construction)
Start: March 17, 7:00 a.m. End: May 19, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM TASKAMANWA ST TO 8TH ST E
(Construction)
Use McOrmond Dr
Start: November 20, 7:00 a.m. End: September 26, 2025, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Woodlawn Cemetery Guidelines for Gravesite Memorials
April 17, 2025 - 10:00am
- Only approved monuments or memorials are considered permanent items and are permitted to remain in the cemetery year-round. All other items placed on a gravesite, flowerbed, monument, or concrete foundation are considered temporary and will be removed periodically.
- Flowers and other items are permitted on the gravesite the day of the burial and will be left for a period of seven calendar days. After this time, items will be removed by the City. Please note, the City does not take responsibility for any removed, damaged, or missing items placed in the cemetery by the public.
- Families may establish a flowerbed at the gravesite upon approval from the Cemetery Office, except for military burials in the Field of Honour and flat marker areas. Annual flowers are allowed, provided they do not hang over the edge of the flowerbed or impede maintenance of adjacent gravesites. Flowerbeds must be approved by the Cemetery Office before installation to ensure they are within guidelines.
- Items not allowed in flowerbeds include shrubs, perennials, decorative fencing, rocks, stones, concrete, and breakable or fragile items.
- The City assumes no responsibility for the appearance, maintenance and fall cleanup of approved flowerbeds planted by the public. If flowerbeds are neglected, they will be removed.
As the weather warms, cemetery staff will begin spring cleanup of the cemetery grounds. The City of Saskatoon reminds visitors to the Woodlawn Cemetery of the guidelines in place for gravesite memorials. These guidelines are intended to maintain a pleasant environment and respect the final resting place of loved ones:
From May 1 to October 15:
Cemetery visiting hours are 8:00 a.m. to 9:00 p.m. daily. The Cemetery Office is open from 8:00 a.m. to 4:20 p.m., Monday through Friday, excluding statutory holidays. For all inquiries, contact the Cemetery Office at 306-975-3308 or cemetery@saskatoon.ca.
20th Street closed between avenues S and T starting Monday
April 17, 2025 - 8:00am
20th Street will be closed between avenues S and T starting Monday, April 21, at 7:00 a.m. for water and sewer connections. Detours are in place guiding motorists around the work zone. This project is expected to take seven days to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
33rd Street closed between 6th and 7th avenues on Saturday
April 17, 2025 - 7:00am
33rd Street will be closed between 6th and 7th avenues on Saturday, April 19, starting at 8:00 a.m. for a valve replacement. Detours are in place guiding motorists around the work zone. This project is expected to take one day to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Bus service to SaskTel Centre this weekend
April 17, 2025 - 6:00am
- 5:45 p.m.
- 6:25 p.m.
- 5:45 p.m.
- 6:25 p.m.
Direct service from the Special Events Stop (23rd Street and 2nd Avenue) to see the Saskatchewan Rush take on the Ottawa Black Bears at SaskTel Centre on Saturday, April 19 at 7:00 p.m., is available at the following times:
Direct service from the Special Events Stop to see Nelly at SaskTel Centre on Sunday, April 20 at 7:00 p.m., is available at the following times:
Post-event drop-off is at the downtown terminal and regular fares apply ($3.00 per trip). Fare can be purchased on your mobile phone using either the TGo or transit app, transfers and passes are also accepted. Typically, buses arrive onsite 30 minutes prior to the end of the event.
Plan your trip to events at SaskTel Centre on Route 333 using the Transit app up to two weeks in advance. Check out the Transit+ feature to help make connections that combine Transit with OnDemand Transit, riide, and Uber. Download the Transit app from the Apple Store or Google Play.
Transit service times for special events at SaskTel Centre and other popular destinations can always be found at SaskatoonTransit.ca/plan-my-trip/popular-destinations. Experience the convenience of using Saskatoon Transit to attend all your favourite events.
Daily Road Report - April 17, 2025
April 16, 2025 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
CUMBERLAND AVE S ROAD CLOSED FROM MCLORG ST TO WILSON CRES
(Emergency connection replacement)
Start: April 17, 8:00 a.m. End: April 17, 6:00 p.m.
ONGOING
BERINI DR SB CURB LANE CLOSED FROM ATTRIDGE DR TO WEBSTER ST
(Construction)
Start: March 17, 7:00 a.m. End: May 19, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM TASKAMANWA ST TO 8TH ST E
(Construction)
Use McOrmond Dr
Start: November 20, 7:00 a.m. End: September 26, 2025, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Adjusted civic services & hours of operation on Good Friday, April 18 & Easter Monday, April 21
April 16, 2025 - 10:46am
The City of Saskatoon will have several adjusted civic services and hours of operation over the Easter Long Weekend.
Wondering what’s open or closed, parking requirements, collection schedules, Saskatoon Transit hours and more? Thinking of visiting a Leisure Centre, Saskatoon Public Library location, the Saskatoon Forestry Farm Park & Zoo or Remai Modern Art Gallery?
Check all the details on the City’s holiday hours and fun activities you might like to take in over the long weekend, here
Adjusted civic services & hours of operation on Good Friday, April 18 & Easter Monday, April 21
April 16, 2025 - 10:37am
- Fixed-route transit will run holiday service hours on Friday, April 18, from 8 a.m. to 10 p.m. (normal fares apply).
- For real-time bus locations and service alerts, and to plan your trip, use the Transit app.
- Visit saskatoontransit.ca
- OnDemand service will not be available on Friday, April 18.
- Access Transit will operate holiday service hours on Friday, April 18 and Monday, April 21 from 8 a.m. to 11 p.m.
- Trips must be booked in advance as per normal procedures.
- Customers are reminded that subscriptions do not apply on Statutory Holidays.
- Transit Customer Service Centre will be closed for walk-in customers on Friday, April 18, but phone lines (306-975-3100) will be open from 9 a.m. to 1 p.m. and 2 p.m. to 6 p.m.
- Friday, April 18: Parking payment is not required.
- Monday, April 21: Parking payment will be required in City-managed pay parking areas.
- Motorists are reminded that all other parking requirements remain in effect, including parking time limits.
- Vehicles will not be released to the public on Friday, April 18.
- Open for regular business on Saturday, April 19 from 12 p.m. - 4 p.m. and on Monday, April 21.
- Information on Vehicle Seizures
- The Material Recovery Centre and Landfill are open on Friday, April 18 and Monday, April 21 from 8 a.m. to 4:45 p.m.
- Cash transactions are accepted, although Credit and Debit are recommended.
- More information at saskatoon.ca/mrc.
- The Compost Depot is open on Friday, April 18 and Monday, April 21 from 9 a.m. to 6 p.m. Vehicles will not be admitted after 5:50 p.m. Compost and mulch loading closes at 5:30 p.m. Check saskatoon.ca/compostdepot for more information.
- The cemetery office is closed on Friday, April 18 & Monday, April 21.
- Cemetery grounds are open to the public 8 a.m. to 9 p.m. daily as per usual.
- Zoo – 10 a.m. to 4 p.m.
- Forestry Farm Park - 7:30 a.m. to 7:00 p.m.
- Cosmo Civic Centre
Friday, April 18 & Monday April 21 – CLOSED - Harry Bailey Aquatic Centre
Closed for facility upgrade. Learn more at saskatoon.ca/harrybailey. - Lakewood Civic Centre
Friday, April 18 – CLOSED
Monday, April 21 – OPEN Regular Hours of Operation (6 a.m. to 10 p.m.) - Lawson Civic Centre
Friday, April 18 – CLOSED
Monday, April 21 – OPEN Regular Hours of Operation (6 a.m. to 10 p.m.) - Saskatoon Field House
Friday, April 18 – CLOSED
Monday, April 21 – OPEN Regular Hours of Operation (6:30 a.m. to 10 p.m.) - Shaw Centre
Friday, April 18 – CLOSED
Monday, April 21 – OPEN Regular Hours of Operation (6 a.m. to 10 p.m.) - Terry Fox Track
Friday, April 18 – CLOSED
Monday, April 21 – OPEN Regular Hours of Operation (10 a.m. to 1 p.m. and 4 p.m. to 8 p.m.)
The City of Saskatoon will have several adjusted civic services and hours of operation over the Easter Long Weekend, as follows:
CITY HALL
City Hall will be closed on Friday, April 18 (Good Friday) and Monday, April 21 (Easter Monday). City Hall will reopen on Tuesday, April 22 at 8 a.m.
ROADWAY DETOURS & CLOSURES
Check here for detailed long weekend road restrictions for priority one roadways.
REMAI MODERN
Remai Modern will be open on Friday, April 18, from 10 a.m. to 9 p.m. and closed on Monday, April 21.
SASKATOON PUBLIC LIBRARY
All Saskatoon Public Library locations will be closed on Friday, April 18.
SASKATOON TRANSIT
PAY PARKING
MUNICIPAL IMPOUND LOT
WASTE COLLECTIONS
Garbage, Recycling, and Organics have collections as scheduled.
MATERIAL RECOVERY CENTRE & LANDFILL
COMPOST DEPOT
WOODLAWN CEMETERY
SASKATOON FORESTRY FARM PARK & ZOO
Regular Hours of Operation
LEISURE CENTRES
Search for drop-in program information including fitness and weight room hours, public swim sessions and fitness programs at dropinschedule.saskatoon.ca
NOTIFYNOW
Residents are encouraged to sign-up to notifynow for timely and targeted public safety messages. notifynow is a free service. Tell us how to best reach you on your preferred communication device. Visit saskatoon.ca/notifynow for more information.
YXE SERVICE ALERTS
For information and updates on service disruptions such as power or water check saskatoon.ca/servicealerts or follow @yxeservicealert on Twitter.
Co-existing with Saskatoon’s urban wildlife
April 16, 2025 - 9:00am
- Do not feed wildlife: You are not helping them. Feeding wild animals can make them lose their natural fear of humans, leading to increased encounters and potential conflicts.
- Secure food sources: Keep garbage, compost, birdseed and pet food out of reach and tightly sealed.
- Keep pets safe: Always supervise pets when they are outside, especially at night. While out on a walk, have pets under your control and on a leash in
areas known to have wildlife. - Respect wildlife: They are not pets. Keep wildlife wild by not approaching or attempting to touch them.
- Use hazing techniques: If you encounter a wild animal, make loud noises, wave your arms and throw small objects towards (but not at) it to scare it away. Do not run or turn your back.
- Report unusual behaviour: If the animal is acting unusual (e.g., approaching people, staggering or acting confused), call Customer Care at
306-975-2476. If the animal is acting aggressive, contact the Saskatoon Police Service non-emergency line at 306-975-8300. If you are in immediate danger, call 911.
As warmer weather approaches, it’s important to remember that we share our urban spaces with many species of wildlife such as coyotes, foxes, geese, jackrabbits and raccoons. Encountering urban wildlife in Saskatoon is normal and these animals play a vital role in our ecosystem. Understanding how to coexist with them can ensure safety for both the wildlife and our community.
Here are some important tips for co-existing with urban wildlife:
By following these guidelines, we can co-exist safely and prevent unwanted encounters with the wildlife that share our urban spaces.
The City continues to work on plans to mitigate aggressive wildlife behaviour, with City Council approving next steps on this matter at its March 26 meeting.
For more information on urban wildlife, visit saskatoon.ca/wildlife.
Cumberland Avenue closed between McLorg Street and Wilson Crescent on Thursday
April 16, 2025 - 6:00am
Cumberland Avenue will be closed between McLorg Street and Wilson Crescent on Thursday, April 17, starting at 8:00 a.m. for an emergency connection replacement. Detours are in place guiding motorists around the work zone. This project is expected to take one day to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Daily Road Report - April 16, 2025
April 15, 2025 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
20TH ST W EB & WB MEDIAN LANES CLOSED AT AVE G S
(Sewer lining)
Start: April 16, 8:00 a.m. End: April 16, 12:00 p.m.
1ST AVE S NB CURB LANE CLOSED AT 22ND ST E
(Construction)
Start: April 16, 8:00 a.m. End: April 16, 4:00 p.m.
ONGOING
CIRCLE DR E NB EXIT RAMP SHOULDER CLOSED AT ATTRIDGE DR
(Streetlight work)
Start: April 14, 9:00 a.m. End: April 16, 3:00 p.m.
ATTRIDGE DR EB SHOULDER CLOSED AT CIRCLE DR E EXIT RAMP
(Streetlight work)
Start: April 14, 9:00 a.m. End: April 16, 3:00 p.m.
AVE P S ROAD CLOSED FROM 19TH ST W TO 20TH ST W
(Construction)
Start: April 15, 7:00 a.m. End: April 16, 5:00 p.m.
BERINI DR SB CURB LANE CLOSED FROM ATTRIDGE DR TO WEBSTER ST
(Construction)
Start: March 17, 7:00 a.m. End: May 19, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM TASKAMANWA ST TO 8TH ST E
(Construction)
Use McOrmond Dr
Start: November 20, 7:00 a.m. End: September 26, 2025, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Spring clean-up of park and open space areas starts
April 15, 2025 - 1:15pm
- Park clean-up, consisting mainly of litter control and removal of branches and leaves from turf areas and shrub beds.
- Pumping out spring run-off in low-lying areas in parks and green spaces.
- Sweeping park-front sidewalks and boulevards where grass, trees and/or flowerpots are located. Full-size street sweepers will follow the same path after to collect the debris left behind on the road.
- Grooming of crusher dust trails in naturalized park areas to remove the ruts from run-off and other winter activities will begin once the trails have fully dried.
- Collecting litter and beginning of mowing cycles to over 400 hectares of open space areas along Circle Drive and other major freeways.
- Emptying of garbage receptacles will increase to at least once a week, at the beginning of May.
- The Sports Field program is gearing up for the May 1 (weather dependent) start date for various sport user groups. Preparations includes infield grooming of the softball/baseball diamonds, turf inspection, litter/garbage control and field line painting.
Spring is here, which means City workers are starting to ramp up maintenance activities for the more than 2,000 hectares of park and open spaces in Saskatoon. Seasonal workers returned mid-April and the park clean-up process will continue until mid-May.
Spring park maintenance activities include:
Residents are reminded that a Park Access Permit is required to access private property from a City park to complete all work including landscaping, construction, tree removal, renovations and building a deck, fence or pool. Homeowners and contractors can request a permit by completing the online application form at least one week prior to the date required. Visit saskatoon.ca/parkaccess to access the form and more information on park access requirements.
For more information on seasonal park maintenance, visit saskatoon.ca/parkmaintenance.
Daily Road Report - April 15, 2025
April 14, 2025 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
AVE P S ROAD CLOSED FROM 19TH ST W TO 20TH ST W
(Construction)
Start: April 15, 7:00 a.m. End: April 16, 5:00 p.m.
20TH ST W EB CURB LANE CLOSED AT AVE B S
(Sewer lining)
Start: April 15, 9:00 a.m. End: April 15, 1:00 p.m.
33RD ST W EB LANES CLOSED FROM CONFEDERATION DR TO MATHESON DR
(Sanitary main repair)
Two-way traffic will be maintained in WB lanes
Start: April 15, 9:00 a.m. End: April 15, 3:00 p.m.
ONGOING
CIRCLE DR E NB EXIT RAMP SHOULDER CLOSED AT ATTRIDGE DR
(Streetlight work)
Start: April 14, 9:00 a.m. End: April 16, 3:00 p.m.
ATTRIDGE DR EB SHOULDER CLOSED AT CIRCLE DR E EXIT RAMP
(Streetlight work)
Start: April 14, 9:00 a.m. End: April 16, 3:00 p.m.
BERINI DR SB CURB LANE CLOSED FROM ATTRIDGE DR TO WEBSTER ST
(Construction)
Start: March 17, 7:00 a.m. End: May 19, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM TASKAMANWA ST TO 8TH ST E
(Construction)
Use McOrmond Dr
Start: November 20, 7:00 a.m. End: September 26, 2025, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
The driving ranges at Silverwood and Holiday Park Golf Courses are scheduled to open Wednesday, April 16
April 14, 2025 - 1:00pm
The driving ranges at Silverwood Golf Course (3503 Kinnear Avenue) and Holiday Park Golf Course (1630 Avenue U South) are scheduled to open on Wednesday, April 16, 2025
Hours of operation will be 9:00 a.m. to 7:00 p.m., daily. Baskets of balls will be sold until 6:30 p.m. Hours are dependent on weather. Please contact Holiday Park or Silverwood for current hours.
Driving Range rates are:
Large Basket (70-75 Balls): $15.00
Medium Basket (40-45 Balls): $10.00
Small Basket (20-25 Balls): $6.00
Season Pass: $500.00 (good for use at both ranges)
Opening dates for Holiday Park, Wildwood and Silverwood golf courses will be announced soon.
For more information about any of the City’s golf courses please visit saskatoon.ca/golf.
Long Weekend Road Report - April 18-21, 2025
April 14, 2025 - 10:14am
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
33RD ST E ROAD CLOSED FROM 6TH AVE N TO 7TH AVE N
(Valve replacement)
Start: April 19, 8:00 a.m. End: April 19, 5:00 p.m.
20TH ST W ROAD CLOSED FROM AVE S S TO AVE T S
(Water and sewer connections)
Start: April 21, 7:00 a.m. End: April 27, 6:00 p.m.
ONGOING
BERINI DR SB CURB LANE CLOSED FROM ATTRIDGE DR TO WEBSTER ST
(Construction)
Start: March 17, 7:00 a.m. End: May 19, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM TASKAMANWA ST TO 8TH ST E
(Construction)
Use McOrmond Dr
Start: November 20, 7:00 a.m. End: September 26, 2025, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Daily Road Report - April 14, 2025
April 11, 2025 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
CIRCLE DR E NB EXIT RAMP SHOULDER CLOSED AT ATTRIDGE DR
(Streetlight work)
Start: April 14, 9:00 a.m. End: April 16, 3:00 p.m.
ATTRIDGE DR EB SHOULDER CLOSED AT CIRCLE DR E EXIT RAMP
(Streetlight work)
Start: April 14, 9:00 a.m. End: April 16, 3:00 p.m.
ONGOING
BERINI DR SB CURB LANE CLOSED FROM ATTRIDGE DR TO WEBSTER ST
(Construction work)
Start: March 17, 7:00 a.m. End: May 19, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM TASKAMANWA ST TO 8TH ST E
(Construction)
Use McOrmond Dr
Start: November 20, 7:00 a.m. End: September 26, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Weekend Road Report - April 12-13, 2025
April 11, 2025 - 2:30pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
4TH AVE S NB LANES CLOSED FROM 20TH ST E TO 21ST ST E
(Sign installation)
Two-way traffic will be maintained in the SB lanes
Start: April 12, 7:00 a.m. End: April 13, 5:00 p.m.
33RD ST W WB LANES CLOSED AT VALENS DR
(Sanitary sewer lining)
Two-way traffic will be maintained in the EB lanes
Start: April 12, 9:00 a.m. End: April 12, 1:00 p.m.
CIRCLE DR E NB & SB MEDIAN LANES CLOSED AT 108TH ST W
(Streetlight replacement)
Start: April 13, 6:30 a.m. End: April 13, 8:00 a.m.
SPADINA CRES SOUTH OF DUDLEY ST CLOSED; ROAD RESTRICTIONS SOUTH OF DUDLEY ST BETWEEN AVENUE P AND SPADINA CRES
(Saskatoon Running Festival)
Event Staff in place to guide traffic during the event
Start: April 13, 8:00 a.m. End: April 13, 12:30 p.m.
COLLEGE DR EB & WB MEDIAN LANES CLOSED AT BUCKWOLD COVE
(Streetlight replacements)
Start: April 13, 9:30 a.m. End: April 13, 11:00 a.m.
ONGOING
BERINI DR SB CURB LANE CLOSED FROM ATTRIDGE DR TO WEBSTER ST
(Construction)
Start: March 17, 7:00 a.m. End: May 19, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM TASKAMANWA ST TO 8TH ST E
(Construction)
Use McOrmond Dr
Start: November 20, 7:00 a.m. End: September 26, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Road restrictions for Saskatoon Running Festival
April 11, 2025 - 6:00am
The Saskatoon Running Festival will take place on Sunday, April 13, from 8:30 a.m. to 12:00 p.m. Road closures and restrictions will be in place south of Dudley Street between Avenue P and Spadina Crescent. Race marshals will be in place at intersections.
Drivers are reminded to drive carefully, watch for participants and officials, and be aware of “no parking” signs along the race route.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
Daily Road Report - April 11, 2025
April 10, 2025 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
COLLEGE DR EB CURB LANE CLOSED FROM CLARENCE AVE N TO UNIVERSITY DR
(Streetlight replacement)
Start: April 11, 9:00 a.m. End: April 11, 1:00 p.m.
AVE P S NB LANES CLOSED FROM 20TH ST W TO 21ST ST W
(Sewer main lining)
Start: April 11, 9:00 a.m. End: April 11, 1:00 p.m.
WARMAN RD SB CURB LANE CLOSED FROM ASSINIBOINE DR TO CIRCLE DR E
(Underground maintenance)
Start: April 11, 9:00 a.m. End: April 11, 3:00 p.m.
ONGOING
BERINI DR SB CURB LANE CLOSED FROM ATTRIDGE DR TO WEBSTER ST
(Construction)
Start: March 17, 7:00 a.m. End: May 19, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM TASKAMANWA ST TO 8TH ST E
(Construction)
Use McOrmond Dr
Start: November 20, 7:00 a.m. End: September 26, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Early street sweeping underway in Saskatoon
April 10, 2025 - 10:00am
With the arrival of spring and the melting of snow, the City of Saskatoon has begun early street sweeping operations to remove winter debris from high-traffic roadways.
Throughout April, crews will focus on major streets—those with heavy traffic and significant buildup of dirt and debris. Sweepers will clear gutters and medians, navigating around parked vehicles to remove as much material as possible before the City-wide full sweep begins.
City-wide street sweeping is set to begin in early May. At that time, temporary “No Parking” signs will be placed to allow crews full access to the curb. Residents are encouraged to move their vehicles as signed to ensure a complete and efficient cleanup of every neighbourhood.
In addition to sweeping, road maintenance teams are actively addressing potholes. Crews are applying cold mix asphalt as a temporary fix to high-priority areas until hot mix becomes available later this month. If you notice a pothole that poses a danger to drivers or a sunken pavement patch, you can report it on the City’s Report a Pothole map and we’ll get to it as soon as we can. More information is available at saskatoon.ca/potholes.
The City of Saskatoon appreciates the cooperation of residents in maintaining clean and well-maintained roadways. For more details on the street sweeping schedule, visit saskatoon.ca/sweep.
We thank all residents for their cooperation in helping keep Saskatoon's roadways clean, safe and ready for the season ahead.
Daily Road Report - April 10, 2025
April 9, 2025 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
PRESTON AVE S NB LANES CLOSED AT WILSON CRES
(Sanitary sewer inspection)
Traffic will be accommodated in the parking lane
Start: April 10, 9:00 a.m. End: April 10, 3:00 p.m.
PRESTON AVE S INTERSECTION PARTIALLY CLOSED AT ARLINGTON AVE
(Sanitary sewer inspection)
Start: April 10, 9:00 a.m. End: April 10, 3:00 p.m.
KINGSMERE BLVD ROAD CLOSED FROM DELARONDE RD TO WHITESHORE CRES
(Hydrant valve replacement)
Start: April 10, 9:00 a.m. End: April 10, 5:00 p.m.
ONGOING
BERINI DR SB CURB LANE CLOSED FROM ATTRIDGE DR TO WEBSTER ST
(Construction)
Start: March 17, 7:00 a.m. End: May 19, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM TASKAMANWA ST TO 8TH ST E
(Construction)
Use McOrmond Dr
Start: November 20, 7:00 a.m. End: September 26, 2025, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Daily Road Report - April 9, 2025
April 8, 2025 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
AVE H N NB CURB LANE CLOSED FROM 23RD ST W TO WALMER RD
(Sewer lining)
Start: April 9, 7:00 a.m. End: April 9, 11:00 a.m.
22ND ST W EB & WB LEFT TURN LANES CLOSED AT AVE D S
(Sewer lining)
Start: April 9, 9:00 a.m. End: April 9, 1:00 p.m.
CIRCLE DR E SB CURB LANE CLOSED AT ATTRIDGE DR
(Fiber work)
Start: April 9, 9:00 a.m. End: April 9, 3:00 p.m.
PRESTON AVE N SHOULDER SQUEEZE OVER FROM PRESTON AVE N TO CIRCLE DR E
(Fiber work)
Start: April 9, 9:00 a.m. End: April 9, 3:00 p.m.
ONGOING
BERINI DR SB CURB LANE CLOSED FROM ATTRIDGE DR TO WEBSTER ST
(Construction)
Start: March 17, 7:00 a.m. End: May 19, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM TASKAMANWA ST TO 8TH ST E
(Construction)
Use McOrmond Dr
Start: November 20, 2023, 7:00 a.m. End: September 26, 2025, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
National Day of Remembrance of the Battle of Vimy Ridge; flags to be lowered April 9
April 8, 2025 - 1:54pm
On April 9, Canada will observe the National Day of Remembrance of the Battle of Vimy Ridge. This day commemorates the sacrifices made by members of the Canadian Corps during the Battle of Vimy Ridge in 1917.
In honour of this significant event, flags at all City of Saskatoon facilities will be flown at half-mast in respect of Canada’s veterans, and to remember the nearly 3,600 soldiers who lost their lives and more than 7,000 who were wounded on that fateful day.
The Battle of Vimy Ridge marked the first time that all four divisions of the Canadian Corps fought in a battle together in the First World War against a common enemy. The Battle is considered by many to be a turning point for our country and the beginning of Canada’s march towards nationhood.
Daily Road Report - April 8, 2025
April 7, 2025 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
CUMBERLAND AVE S ROAD CLOSED FROM HANSON ST TO MCLORG ST
(Emergency Connection Replacement)
Start: April 8, 8:00 a.m. End: April 8, 6:00 p.m.
2ND AVE S SB ROUNDABOUT CLOSED AT SPADINA CRES E
(Menorah takedown)
Start: April 8, 9:00 a.m. End: April 8, 11:00 a.m.
WANUSKEWIN RD SB CURB LANE CLOSED FROM 51ST ST E TO LENORE DR
(Electrical work)
Start: April 8, 10:00 a.m. End: April 8, 11:00 a.m.
ONGOING
BERINI DR SB CURB LANE CLOSED FROM ATTRIDGE DR TO WEBSTER ST
(Construction)
Start: March 17, 7:00 a.m. End: May 19, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM TASKAMANWA ST TO 8TH ST E
(Construction)
Use McOrmond Dr
Start: November 20, 2023, 7:00 a.m. End: September 26, 2025, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Ice melting on recreational ponds and South Saskatchewan River
April 7, 2025 - 1:00pm
As the weather continues to warm up, the Saskatoon Fire Department would like to advise the public to be mindful of ice conditions.
Ice thickness is no longer suitable for winter recreational use. The ice must reach a minimum thickness of at least eight inches to be considered safe. Fire crews will be updating the posted signage this week to read “No Skating” at each recreational storm pond.
Community members who use the ponds for recreational purposes assume all risk and maintenance responsibilities for the ice including removing personal belongings, as well as user safety.
Additionally, ice on the South Saskatchewan River has also started to melt. The ice that covers this body of water is unpredictable and is therefore never safe for winter recreational use. Residents are asked to never venture out onto the ice that covers sections of the South Saskatchewan River.
Community members are advised to always exercise an elevated level of caution when around any large body of water. Keep a close watch on children and pets when visiting trails, parks, or off-leash areas that may run adjacent to the South Saskatchewan River or a storm water retention pond.
For more information regarding the Recreational Uses of Storm Water Retention Ponds policy, visit saskatoon.ca/ponds.
City Compost Depot set to open on Monday, April 14
April 7, 2025 - 10:00am
The City’s Compost Depot is set to open in time for spring clean-up. Residents are invited to drop off excess yard waste, including leaves, grass, sod, topsoil, garden refuse, non-elm branches, stumps and tree trimmings, at no cost. This helps keep yard waste out of the Landfill and produces high-quality, nutrient-rich compost and mulch used in Saskatoon’s parks and community gardens.
In addition to dropping off yard waste, residents are welcome to take part in the Dig-Your-Own program at the Compost Depot, located at Highway 7 and 11th Street. Residents can self-load up to 1 cubic yard of compost and mulch at no cost, while supplies last. Accessibility will be dictated by site conditions. The Compost Depot is open 7 days a week, including statutory holidays from 9:00 a.m. to 6:00 p.m. with the final vehicles being admitted at 5:50 p.m.
All loads must be covered when transported within City limits to prevent debris from blowing off vehicles (Waste Bylaw #9844).
The City Compost Depot does NOT accept elm wood, sawdust, treated and untreated lumber, building materials, garbage, or any animal waste/litter. Food waste is also NOT accepted for drop-off at the compost depots; selected food waste may be composted at home and all food waste can be placed in Green Carts. Excess yard waste is welcomed at the Compost Depot.
For more information, please visit saskatoon.ca/compostdepot.
2nd Avenue closed at Spadina Crescent on Tuesday
April 7, 2025 - 7:00am
2nd Avenue will be closed at Spadina Crescent on Tuesday, April 8, starting at 9:00 a.m. for an installation removal. Detours are in place guiding motorists around the work zone. This project is expected to take half a day to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Cumberland Avenue closed between Hanson and McLorg streets on Tuesday
April 7, 2025 - 6:00am
Cumberland Avenue will be closed between Hanson and McLorg streets on Tuesday, April 8, starting at 8:00 a.m. for an emergency connection replacement. Detours are in place guiding motorists around the work zone. This project is expected to take one day to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Daily Road Report - April 7, 2025
April 4, 2025 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
No new projects are scheduled to start on this date.
ONGOING
BERINI DR SB CURB LANE CLOSED FROM ATTRIDGE DR TO WEBSTER ST
(Construction)
Start: March 17, 7:00 a.m. End: May 19, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM TASKAMANWA ST TO 8TH ST E
(Construction)
Use McOrmond Dr
Start: November 20, 2023, 7:00 a.m. End: September 26, 2025, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Weekend Road Report - April 5-6, 2025
April 4, 2025 - 2:30pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
51ST ST E EB & WB MEDIAN LANES CLOSED FROM WARMAN RD TO MILLAR AVE
(Railway crossing upgrade)
Start: April 5, 7:00 a.m. End: April 6, 5:00 p.m.
IDYLWYLD DR SB EXIT RAMP CURB LANE CLOSED TO 8TH ST E
(Streetlight replacement)
Start: April 6, 6:30 a.m. End: April 6, 8:00 a.m.
ATTRIDGE DR EB & WB CURB LANE CLOSED AT CIRCLE DR E
(Pole replacements)
Start: April 6, 6:30 a.m. End: April 6, 8:30 a.m.
CIRCLE DR E NB & SB MEDIAN LANES CLOSED AT ATTRIDGE DR
(Pole replacements)
Start: April 6, 6:30 a.m. End: April 6, 8:30 a.m.
CIRCLE DR W NB CURB LANE CLOSED FROM AVE W N TO 33RD ST W
(Pole replacements)
Start: April 6, 8:00 a.m. End: April 6, 9:30 a.m.
HIGHWAY 11 NB & SB MEDIAN LANES CLOSED AT CIRCLE DR E
(Streetlight replacement)
Start: April 6, 8:30 a.m. End: April 6, 9:30 a.m.
CIRCLE DR E SB CURB LANE CLOSED AT TAYLOR ST E
(Streetlight replacement)
Start: April 6, 9:30 a.m. End: April 6, 10:30 a.m.
CIRCLE DR W EXIT RAMP CLOSED AT AIRPORT DR
(Streetlight replacement)
Start: April 6, 9:30 a.m. End: April 6, 12:30 p.m.
CIRCLE DR E WB CURB LANE CLOSED RAMP AT WARMAN RD
(Streetlight replacement)
Start: April 6, 10:30 a.m. End: April 6, 11:30 a.m.
AVE C N SB CURB LANE CLOSED FROM IDYLWYLD DR N TO HANGAR RD
(Streetlight replacement)
Start: April 6, 12:30 p.m. End: April 6, 3:30 p.m.
ONGOING
BERINI DR SB CURB LANE CLOSED FROM ATTRIDGE DR TO WEBSTER ST
(Construction)
Start: March 17, 7:00 a.m. End: May 19, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM TASKAMANWA ST TO 8TH ST E
(Construction)
Use McOrmond Dr
Start: November 20, 2023, 7:00 a.m. End: September 26, 2025, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.