News Releases
Saskatoon Fire - News Releases
Daily Road Report - June 14, 2022
June 13, 2022 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
3RD AVE N ROAD CLOSED FROM 25TH TO QUEEN ST
(Water main repair)
Start: June 14, 7:00 a.m. End: July 5, 5:00 p.m.
CIRCLE DR S WB CENTRE LANE CLOSED AT IDYLWYLD DR S
(Crash cushion repair)
Start: June 14, 9:00 a.m. End: June 14, 3:00 p.m.
8TH ST E EB & WB MEDIAN LANES CLOSED FROM EMERSON AVE TO GOODWIN AVE
(Streetlight repair)
Start: June 14, 9:00 a.m. End: June 14, 3:00 p.m.
CIRCLE DR E EB &WB MEDIAN & NEXT LANE CLOSED FROM QUEBEC AVE TO 1ST AVE N
(Manhole & catch basin work)
Start: June 14, 9:00 a.m. End: June 14, 3:00 p.m.
RUTH ST E INTERSECTION CLOSED AT HANOVER AVE
(Roadway patching)
Start: June 14, 9:00 a.m. End: June 14, 3:00 p.m.
TAYLOR ST E EB LANES CLOSED FROM LANSDOWNE AVE TO YORK AVE
(Roadway patching)
Start: June 14, 9:00 a.m. End: June 14, 3:00 p.m.
CONFEDERATION DR NB & SB MEDIAN LANES CLOSED AT JOHN A MACDONALD RD
(Sewer lining)
Start: June 14, 9:00 a.m. End: June 14, 3:00 p.m.
NIGHTWORK
CIRCLE DR E EB & WB MEDIAN LANES CLOSED FROM DIEFENBAKER PARK RD TO SPADINA CRES W
(Bridge deck washing)
Start: June 13, 8:00 p.m. End: June 14, 6:00 a.m.
CIRCLE DR S EB & WB CURB LANES CLOSED FROM DIEFENBAKER PARK RD TO SPADINA CRES W
(Bridge deck washing)
Start: June 14, 8:00 p.m. End: June 15, 6:00 a.m.
ONGOING
3RD AVE N INTERSECTION CLOSED AT 26TH ST E
(Watermain construction)
Start: June 6, 7:00 a.m. End: June 14, 7:00 a.m.
RUTH ST E WB PARKING LANE CLOSED FROM BROADWAY AVE TO VICTORIA AVE
(Concrete work)
Start: June 8, 7:00 a.m. End: June 14, 6:00 p.m.
4TH AVE N NB RIGHT TURN BAY CLOSED FROM 19TH ST E TO 20TH ST E
(Light repairs)
Start: June 8, 7:00 a.m. End: June 21, 6:00 p.m.
20TH ST W ROAD CLOSED FROM AVE W S TO AVE V S
(Watermain work)
Start: June 7, 9:00 a.m. End: June 17, 6:00 p.m.
33RD ST W SHOULDER CLOSURE AT CIRCLE DR W
(Concrete repairs)
Start: June 9, 7:00 a.m. End: June 20, 5:00 p.m.
DUNDONALD AVE ROAD CLOSED FROM 11TH ST W TO MOUNTBATTEN ST
(Storm sewer work)
Start: April 28, 7:00 a.m. End: June 23, 6:00 p.m.
NELSON RD EB CURB LANE CLOSED FROM HEATH AVE TO HEAL AVE
(Material laydown)
Start: May 30, 7:00 a.m. End: June 30, 4:30 p.m.
8TH ST E INTERSECTION CLOSED AT BRIGHTON BLVD
(Construction)
Start: May 9, 9:00 a.m. End: July 11, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
3rd Avenue closed between 25th and Queen streets starting Tuesday
June 13, 2022 - 8:00am
3rd Avenue will be closed between 25th and Queen streets starting Tuesday, June 14, at 7:00 a.m. for water main work. 26th Street will be closed between 3rd and 4th avenues during this project. Detours will be in place guiding motorists around the work zone. This project is expected to take 22 days to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Ruth Street intersection closed at Hanover Avenue on Tuesday
June 13, 2022 - 7:00am
The intersection at Ruth Street and Hanover Avenue will be closed on Tuesday, June 14, at 9:00 a.m. for roadway patching work. Detours will be in place guiding motorists around the work zone. This project is expected to take six hours to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Daily Road Report - June 13, 2022
June 10, 2022 - 8:59am
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
MCKERCHER DR NB CURB LANE CLOSED FROM AVONDALE RD TO HOLLAND RD
(Roadway patching)
Start: June 13, 7:00 a.m. End: June 13, 3:00 p.m.
CIRCLE DR E WB CURB AND NEXT LANE CLOSED AT VENTURE CRES
(Roadway patching)
Start: June 13, 9:00 a.m. End: June 13, 12:00 p.m.
33RD ST W EB & WB LANES REDUCED FROM NORTHUMBERLAND AVE TO JUNOR AVE
(Sanitary lining)
Start: June 13, 9:00 a.m. End: June 13, 3:00 p.m.
CIRCLE DR E NB & SB SPEED REDUCED FROM 8TH ST E TO 14TH ST E
(Ditch mowing)
Start: June 13, 9:00 a.m. End: June 13, 3:00 p.m.
CENTRAL AVE SB LANES CLOSED FROM 110TH ST W TO 109TH ST W
(Roadway patching)
Two-way traffic maintained in NB lanes
Start: June 13, 9:00 a.m. End: June 13, 3:00 p.m.
8TH ST E EB CURB & CENTRE LANES CLOSED FROM MCKERCHER DR TO BOYCHUK DR
(Roadway patching)
Start: June 13, 9:00 a.m. End: June 13, 3:00 p.m.
NIGHTWORK
CIRCLE DR E EB & WB MEDIAN LANES CLOSED FROM DIEFENBAKER PARK RD TO SPADINA CRES W
(Bridge deck washing)
Start: June 13, 8:00 p.m. End: June 14, 6:00 a.m.
ONGOING
TAYLOR ST E EB CURB LANE CLOSED AT KINGSMERE BLVD
(Catch basin lead repair)
Start: June 12, 8:00 a.m. End: June 13, 4:30 p.m.
33RD ST W SB TO WB PARKING LANE CLOSURE AT LATRACE RD
(Concrete repair)
Start: June 9, 7:00 a.m. End: June 13, 5:00 p.m.
33RD ST W WB PARKING LANE CLOSED AT TILLEY AVE
(Concrete repair)
Start: June 9, 7:00 a.m. End: June 13, 5:00 p.m.
CIRCLE DR E EB CURB LANE CLOSED FROM FAITHFULL AVE TO MILLAR AVE
(Concrete repairs)
Start: June 2, 12:00 p.m. End: June 13, 6:00 p.m.
3RD AVE N INTERSECTION CLOSED AT 26TH ST E
(Watermain construction)
Start: June 6, 7:00 a.m. End: June 14, 7:00 a.m.
RUTH ST E WB PARKING LANE CLOSED FROM BROADWAY AVE TO VICTORIA AVE
(Concrete work)
Start: June 8, 7:00 a.m. End: June 14, 6:00 p.m.
4TH AVE N NB RIGHT TURN BAY CLOSED FROM 19TH ST E TO 20TH ST E
(Streetlight repairs)
Start: June 8, 7:00 a.m. End: June 16, 6:00 p.m.
20TH ST W ROAD CLOSED FROM AVE W S TO AVE V S
(Watermain work)
Start: June 7, 9:00 a.m. End: June 17, 6:00 p.m.
33RD ST W SHOULDER CLOSURE AT CIRCLE DR W
(Concrete repair)
Start: June 9, 7:00 a.m. End: June 20, 5:00 p.m.
DUNDONALD AVE ROAD CLOSED FROM 11TH ST W TO MOUNTBATTEN ST
(Storm sewer work)
Start: April 28, 7:00 a.m. End: June 23, 6:00 p.m.
HEAL AVE SB CURB LANE CLOSED FROM NELSON RD TO LUDLOW ST
(MATERIAL LAYDOWN)
Start: May 30, 7:00 a.m. End: June 30, 4:30 p.m.
NELSON RD EB CURB LANE CLOSED FROM HEATH AVE TO HEAL AVE
(Material laydown)
Start: May 30, 7:00 a.m. End: June 30, 4:30 p.m.
8TH ST E INTERSECTION CLOSED AT BRIGHTON BLVD
(Construction)
Start: May 9, 9:00 a.m. End: July 11, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Weekend Road Report - June 11-12, 2022
June 10, 2022 - 8:24am
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
CIRCLE DR W EB & WB CURB LANES CLOSED FROM DIEFENBAKER PARK RD TO SPADINA CRES W
(Bridge testing)
Start: June 11, 7:00 a.m. End: June 11, 1:00 p.m.
IDYLWYLD DR S NB & SB MEDIAN LANES CLOSED AT RUTH ST E
(Deck inspections)
Start: June 11, 8:00 a.m. End: June 11, 10:00 a.m.
IDYLWYLD DR S WB CURB LANE CLOSED AT CIRCLE DR S
(Deck inspections)
Start: June 11, 8:00 a.m. End: June 11, 10:00 a.m.
CIRCLE DR W NB & SB MEDIAN LANES CLOSED AT 22ND ST W
(Deck inspections)
Start: June 11, 8:00 a.m. End: June 11, 10:00 a.m.
BROADWAY AVE NB & SB MEDIAN LANES CLOSED AT 6TH ST E
(Sewer lining)
Start: June 11, 9:00 a.m. End: June 11, 3:00 p.m.
IDYLWYLD DR N NB SHOULDER LANE CLOSED AT 9TH ST E
(Sanitary sewer lining)
Start: June 11, 9:00 a.m. End: June 11, 3:00 p.m.
22ND ST E EB CURB LANE CLOSED FROM CONFEDERATION DR TO CIRCLE DR W
(Wall pack replacements)
Start: June 12, 8:00 a.m. End: June 12, 12:00 p.m.
TAYLOR ST E EB CURB LANE CLOSED AT KINGSMERE BLVD
(Catch basin lead repair)
Start: June 12, 8:00 a.m. End: June 13, 4:30 p.m.
8TH ST E EB CURB & NEXT LANES CLOSED FROM ALBERT AVE TO CLARENCE AVE S
(Roadway patching)
Start: June 12, 9:00 a.m. End: June 12, 3:00 p.m.
22ND ST W EB LANES CLOSED FROM AVE N S TO AVE L S
(Roadway patching)
Start: June 12, 9:00 a.m. End: June 12, 3:00 p.m.
CIRCLE DR E WB MEDIAN LANE CLOSED AT WARMAN RD
(Streetlight replacement)
Start: June 12, 12:00 p.m. End: June 12, 3:00 p.m.
CIRCLE DR S WB CURB LANE CLOSED AT VALLEY RD
(Streetlight replacement)
Start: June 12, 3:30 p.m. End: June 12, 5:30 p.m.
ONGOING
1ST AVE N NB & SB MEDIAN LANES CLOSED FROM QUEEN ST TO KING ST
(Sand blasting)
Traffic will be maintained in parking lanes
Start: June 6, 7:00 a.m. End: June 11, 5:00 p.m.
33RD ST W SB & WB PARKING LANES CLOSED AT LATRACE RD
(Concrete repairs)
Start: June 9, 7:00 a.m. End: June 13, 5:00 p.m.
33RD ST W WB PARKING LANE CLOSED AT TILLEY AVE
(Concrete repairs)
Start: June 9, 7:00 a.m. End: June 13, 5:00 p.m.
CIRCLE DR E EB CURB LANE CLOSED FROM FAITHFULL AVE TO MILLAR AVE
(Concrete repairs)
Start: June 2, 12:00 p.m. End: June 13, 6:00 p.m.
3RD AVE N INTERSECTION CLOSED AT 26TH ST E
(Watermain construction)
Start: June 6, 7:00 a.m. End: June 14, 7:00 a.m.
RUTH ST E WB PARKING LANE CLOSED FROM BROADWAY AVE TO VICTORIA AVE
(Concrete work)
Start: June 8, 7:00 a.m. End: June 14, 6:00 p.m.
4TH AVE N NB RIGHT TURN BAY CLOSED FROM 19TH ST E TO 20TH ST E
(Light repairs)
Start: June 8, 7:00 a.m. End: June 16, 6:00 p.m.
20TH ST W ROAD CLOSED FROM AVE W S TO AVE V S
(Watermain work)
Start: June 7, 9:00 a.m. End: June 17, 6:00 p.m.
33RD ST W SHOULDER CLOSURE AT CIRCLE DR W
(Concrete repairs)
Start: June 9, 7:00 a.m. End: June 20, 5:00 p.m.
DUNDONALD AVE ROAD CLOSED FROM 11TH ST W TO MOUNTBATTEN ST
(Storm sewer work)
Start: April 28, 7:00 a.m. End: June 23, 6:00 p.m.
NELSON RD EB CURB LANE CLOSED FROM HEATH AVE TO HEAL AVE
(Material laydown)
Start: May 30, 7:00 a.m. End: June 30, 4:30 p.m.
8TH ST E INTERSECTION CLOSED AT BRIGHTON BLVD
(Construction)
Start: May 9, 9:00 a.m. End: July 11, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Structure Fire - 202 Kirkpatrick Crescent
June 10, 2022 - 4:22am
At 8:50 a.m. today, Saskatoon Fire Department (SFD) received multiple 911 calls reporting a house on fire on Kirkpatrick Crescent. Dispatched to the scene were three engines, one ladder truck, one rescue unit and a Battalion Chief. On arrival, fire crews found a house with an attached garage with significant fire and smoke showing. Crews began an aggressive attack with multiple large lines to knock the fire down. There was significant fire damage to the house including the loss of the roof structure. Preliminary indication is the fire started on the exterior of the house and spread to the whole structure.
There were no injuries as a result of this fire.
The fire is under investigation and further information will be provided when available.
Save the date! The City’s Annual Civic Pancake Fundraising Breakfast is next week!
June 9, 2022 - 11:38am
Flip Flip hurraaaay! It's been two long years...and we pan-cake it any longer!
The 46th Annual Civic Pancake Breakfast is next week and, as always, all proceeds from this annual fundraiser are donated to United Way Saskatoon & Area for all the great and dedicated work they do in our community. Mayor Charlie Clark, City Councillors and other celebrity pancake flippers will be in attendance! Bring your friends and plan to attend!
Civic Pancake Breakfast Event Details:
When: Thursday, June 16, 2022
Time: Breakfast served 7:30 a.m. – 10:30 a.m.
Location: Held outside rain or shine in Civic Square at 23rd Street, beside City Hall
Cost: $7 pancake breakfast includes choice of toppings, sausages, coffee & juice
Payment method: Cash or Debit card
We have an exciting lineup this year including Saskatoon Police Service vehicle displays, booths, an entertainment stage with various ethnic dancers including a tribute to Ukraine, musicians, furry mascots, the always anticipated and fun to watch team relay race (8:30 a.m. – 9:30 a.m.), public engagement booth and more!
New this year! Help United Way Saskatoon & Area and pay it forward through our Act of Kindness Board!
Since we've not had this important fundraiser in a couple of years, we're hoping we can all help pay it forward with an extra push for kindness through our collective donations. The Saskatoon City Employees Credit Union and the City of Saskatoon have partnered to bring an Act of Kindness Board to this year's Civic Pancake Breakfast. You’ll have the option to purchase an extra $7 ticket to donate to someone in need of a hot breakfast.
The City of Saskatoon is proud to host this annual zero-waste event with compostable, recyclable, and reusable supplies.
In advance, we thank all our valued sponsors who helped to make this fundraising event possible, successful, and sure to be a well-attended community event!
Hope you can attend! Our fingers are crossed for loads of sunshine!
Daily Road Report - June 10, 2022
June 9, 2022 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
22ND ST E ROAD CLOSED FROM 4TH AVE N TO 5TH AVE N
(Crosswalk line painting)
Start: June 10, 7:30 a.m. End: June 10, 9:00 a.m.
COLLEGE DR WB MEDIAN LANE CLOSED AT CP RAIL OVERPASS
(Bridge maintenance)
Start: June 10, 9:00 a.m. End: June 10, 3:00 p.m.
ONGOING
LENORE DR WB CURB & PARKING LANE CLOSED AT ROBORECKI CRES
(Catch basin work)
Start: June 9, 8:00 a.m. End: June 10, 4:30 p.m.
33RD ST E EB RIGHT TURN BAY & CURB LANE CLOSED AT 3RD AVE N
(Intersection improvements)
Start: May 9, 7:00 a.m. End: June 10, 5:00 p.m.
1ST AVE N NB & SB MEDIAN LANES CLOSED FROM QUEEN ST TO KING ST
(Sand blasting)
Traffic will be maintained in parking lanes
Start: June 6, 7:00 a.m. End: June 11, 5:00 p.m.
33RD ST W SB & WB PARKING LANE CLOSURE AT LATRACE RD
(Concrete repair)
Start: June 9, 7:00 a.m. End: June 13, 5:00 p.m.
33RD ST W WB PARKING LANE CLOSED AT TILLEY AVE
(Concrete repair)
Start: June 9, 7:00 a.m. End: June 13, 5:00 p.m.
CIRCLE DR E EB CURB LANE CLOSED FROM FAITHFULL AVE TO MILLAR AVE
(Concrete repairs)
Start: June 2, 12:00 p.m. End: June 13, 6:00 p.m.
3RD AVE N INTERSECTION CLOSED AT 26TH ST E
(Watermain construction)
Start: June 6, 7:00 a.m. End: June 14, 7:00 a.m.
4TH AVE N NB RIGHT TURN BAY CLOSED FROM 19TH ST E TO 20TH ST E
(Light repairs)
Start: June 8, 7:00 a.m. End: June 16, 6:00 p.m.
2ND AVE S ROAD CLOSED FROM 20TH ST E TO 21ST ST E
(Anode installation)
Start: June 7, 7:00 a.m. End: June 17, 5:00 p.m.
20TH ST W ROAD CLOSED FROM AVE W S TO AVE V S
(Watermain work)
Start: June 7, 9:00 a.m. End: June 17, 6:00 p.m.
33RD ST W SHOULDER CLOSURE AT CIRCLE DR W
(Concrete repairs)
Start: June 9, 7:00 a.m. End: June 20, 5:00 p.m.
RUTH ST E WB PARKING LANE CLOSED FROM BROADWAY AVE TO VICTORIA AVE
(Concrete work)
Start: June 8, 7:00 a.m. End: June 21, 6:00 p.m.
DUNDONALD AVE ROAD CLOSED FROM 11TH ST W TO MOUNTBATTEN ST
(Storm sewer work)
Start: April 28, 7:00 a.m. End: June 23, 6:00 p.m.
NELSON RD EB CURB LANE CLOSED FROM HEATH AVE TO HEAL AVE
(Material laydown)
Start: May 30, 7:00 a.m. End: June 30, 4:30 p.m.
8TH ST E INTERSECTION CLOSED AT BRIGHTON BLVD
(Construction)
Start: May 9, 9:00 a.m. End: July 11, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
City receives federal funds for Farmers’ Market Building project
June 8, 2022 - 7:23am
The City is pleased to announce the approval of $750,000 in Government of Canada funding through PrairiesCan under the Canada Community Revitalization Fund (CCRF) for the interior renovations of the Farmers’ Market Building at River Landing.
“Our government is pleased to support infrastructure projects through the Canada Community Revitalization Fund that provide Canadians with opportunities to connect and explore their communities,” said the Honourable Daniel Vandal, Minister for PrairiesCan. “The renovated Saskatoon Farmers’ Market Building will continue to be an important hub of social activity and a favourite source for fresh produce and locally produced goods.”
The City is currently working with consultants Henry Downing Architects and Stantec Consulting to complete the interior design, plan mechanical and other infrastructure upgrades, and manage the construction project. The renovation project will upgrade the washroom facilities and mechanical systems, as well as prepare permanent tenant spaces for the building’s intended use as a public market with a dedicated seasonal outdoor farmers’ market. Construction on the project is estimated to begin fall 2022.
“This important investment will help to revitalize the Farmers’ Market Building and bring even more activity to River Landing,” said Mayor Charlie Clark. “This exciting renovation project will give residents and visitors a world class experience when they buy goods and produce from our local producers and artisans.”
To achieve the goal of establishing a fully animated Farmers’ Market Building, the renewal project is estimated to cost $1.65M. Funding of $400,000 has been allocated from the City’s Civic Building Comprehensive Maintenance reserve, $1.1M in capital funding was secured through the 2022/2023 budget deliberations and $150,000 was supported as a post-budget request in 2021 to hire the Design Consultant.
The City is working to complete a lease agreement with Ideas Inc. to operate the new public market at River Landing a minimum of six days a week and provide a vibrant community destination and gathering place that will focus on Saskatchewan produce and content.
Street Stall Saturdays, an outdoor market, has returned to Market Square in River Landing for the 2022 growing season.
For more information on the Farmers’ Market Building at River Landing, visit saskatoon.ca/farmersmarket.
About the Canada Community Revitalization Fund
The Canada Community Revitalization Fund (CCRF) helps communities rebound from the COVID-19 pandemic. The fund assists non-profit organizations, municipalities, community groups, and Indigenous communities across Canada to build and improve community infrastructure projects. The CCRF is a two-year, $500 million national infrastructure program to revitalize communities across Canada.
22nd Street closed between 4th and 5th avenues on Friday
June 6, 2022 - 9:56am
22nd Street will be closed between 4th and 5th avenues on Friday, June 10, at 7:30 a.m. for crosswalk painting. Detours will be in place guiding motorists around the work zone. This project is expected to take 1.5 hours to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.