Saskatoon Fire - News Releases
Daily Road Report - August 20, 2024
August 19, 2024 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
SPADINA CRES E ROAD CLOSED FROM 2ND AVE S TO 3RD AVE S
(Construction)
Start: August 20, 7:00 a.m. End: August 20, 12:00 p.m.
22ND ST W EB MEDIAN LANE CLOSED FROM AVE G S TO AVE D S
(Sanitary sewer lining)
Start: August 20, 8:00 a.m. End: August 20, 3:00 p.m.
PRESTON AVE S WB LANES CLOSED AT TAYLOR ST E
(Sewer inspections)
Start: August 20, 9:00 a.m. End: August 20, 1:00 p.m.
20TH ST W ROAD CLOSED FROM AVE B S TO AVE C S
(Roadway patching)
Start: August 20, 9:00 a.m. End: August 20, 3:00 p.m.
CIRCLE DR E NB CURB LANE CLOSED FROM CIRCLE DR S TO TAYLOR ST E
(Light cable repairs)
Start: August 20, 9:00 a.m. End: August 20, 3:00 p.m.
NIGHT WORK
HIGHWAY 11 SB CURB & RAMP CLOSED AT VIC BLVD
(Pavement markings)
Start: August 20, 7:00 p.m. End: August 21, 5:00 a.m.
HIGHWAY 11 NB MEDIAN LANE CLOSED FROM VIC BLVD TO HIGHWAY 16
(Road resurfacing)
Start: August 20, 7:00 p.m. End: August 21, 6:00 a.m.
IDYLWYLD DR N NB CURB LANE CLOSED FROM MARQUIS DR E TO 71ST ST E
(Road resurfacing)
Start: August 20, 7:00 p.m. End: August 21, 6:00 a.m.
ONGOING
CIRCLE DR E EB & WB CURB LANES CLOSED FROM SPADINA CRES E TO PRESTON AVE N
(Deck washing)
Start: August 19, 8:00 p.m. End: August 20, 6:00 a.m.
IDYLWYLD DR N NB CURB LANE CLOSED FROM MARQUIS DR E TO 71ST ST E
(Road resurfacing)
Start: August 19, 7:00 p.m. End: August 20, 6:00 a.m.
11TH ST W INTERSECTION CLOSED AT FAIRLIGHT DR
(Construction)
Start: August 19, 7:00 a.m. End: August 23, 5:00 p.m.
MELVILLE ST INTERSECTION CLOSED AT PORTAGE AVE
(Construction)
Start: July 31, 7:00 a.m. End: August 26, 5:00 p.m.
11TH ST W EB LANES CLOSED FROM CRESCENT BLVD TO FAIRLIGHT DR
(Infrastructure improvements)
Start: July 31, 7:00 a.m. End: August 28, 4:00 p.m.
MCORMOND DR SB CURB LANE/RIGHT TURN LANE CLOSED FROM MCCRORY LINK TO FEDORUK DR
(Streetscaping)
Start: July 26, 7:00 a.m. End: August 29, 4:30 p.m.
20TH ST W EB CURB LANE CLOSED AT AVE E S
(Water main work)
Start: August 7, 7:00 a.m. End: September 3, 4:30 p.m.
7TH AVE N ROAD CLOSED FROM OSBORNE ST TO WINDSOR ST
(Water main maintenance)
Start: August 8, 7:00 a.m. End: September 8, 5:00 p.m.
KENSINGTON GATE INTERSECTION CLOSED AT NEAULT RD
(Construction)
Start: May 2, 9:00 a.m. End: August 31, 4:00 p.m.
COLLEGE DR EB LANES CLOSED FROM CLARENCE AVE N TO WIGGINS AVE N
(Water main maintenance)
Start: August 19, 7:00 a.m. End: September 16, 5:00 p.m.
8TH ST E ROAD CLOSED FROM MCORMOND DR TO ZIMMERMAN RD
(Road construction)
No access to Zimmerman Rd from 8th St
Start: June 10, 7:00 a.m. End: October 31, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM TASKAMANWA ST TO 8TH ST E
(Construction)
Use McOrmond Dr
Start: November 20, 7:00 a.m. End: November 18, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
City warns public: beware of utility services phone scam
August 19, 2024 - 11:30am
- These types of demanding ‘pay - or have your power cut-off’ phone messages, Robocalls, texts or emails are never sent from the City of Saskatoon or Saskatoon Light & Power.
- The City never requests or collects credit card or bank account information from customers via phone, text or email.
- The City typically uses application forms to collect banking information for setting up new utility accounts, direct debit bill payments or for the TIPPS program.
- Never give out your personal or banking information, or credit card number over the phone, by text or email. It is a best practice to block suspicious phone numbers and delete after reporting.
- Do not to click on suspicious web links.
It appears the scammers are at it again - hoping to take advantage of unsuspecting utility customers.
The City wants to warn residents again about an identified scam involving phone calls appearing to come from the resident’s utility company.
The caller indicates that the resident or business has a delinquent account and owes money, otherwise their power will be shut off. A number of concerned business owners have contacted the City on this matter.
Helpful reminders for residents:
Scammers typically use the information they gather this way to get money or commit identity theft. Previous public service announcements from the City have warned residents about scams involving fake text messages and emails, both demanding payment from customers they said ‘owed money’.
Residents should contact their bank if they have become a victim of fraud, and also report these types of phone or online scams to Saskatoon Police Service at saskatoonpolice.ca/onlinereporting/fraud or the Canadian Anti-Fraud Center, 1-888-495-8501.
Concerned residents may also call the City of Saskatoon to speak with a Customer Service Representative at 306-975-2400.
Spadina Crescent closed from 2nd to 3rd avenues on Tuesday
August 19, 2024 - 8:00am
Spadina Crescent will be closed between 2nd and 3rd avenues on Tuesday, August 20, starting at 7:00 a.m. for construction. Detours will be in place guiding motorists around the work zone. This project is expected to take half a day to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Highway 11 ramp to Vic Boulevard closed starting Tuesday night
August 19, 2024 - 7:00am
The Highway 11 southbound ramp to Vic Boulevard westbound will be closed starting on Tuesday, August 20, at 7:00 p.m. for pavement markings. Detours will be in place guiding motorists around the work zone. This project is expected to take one night to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
20th Street closed from Avenues B to C on Tuesday
August 19, 2024 - 6:00am
20th Street will be closed between Avenues B and C on Tuesday, August 20, starting at 9:00 a.m. for roadway patching. Detours will be in place guiding motorists around the work zone. This project is expected to take one day to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Daily Road Report - August 19, 2024
August 16, 2024 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
11TH ST W INTERSECTION CLOSED AT FAIRLIGHT DR
(Construction)
Start: August 19, 7:00 a.m. End: August 23, 5:00 p.m.
COLLEGE DR EB LANES CLOSED FROM CLARENCE AVE N TO WIGGINS AVE N
(Water main maintenance)
Start: August 19, 7:00 a.m. End: September 16, 5:00 p.m.
IDYLWYLD DR N NB CURB LANE CLOSED FROM MARQUIS DR E TO 71ST ST E
(Road resurfacing)
Start: August 19, 7:00 p.m. End: August 20, 6:00 a.m.
CIRCLE DR E EB & WB CURB LANES CLOSED FROM SPADINA CRES E TO PRESTON AVE N
(Deck washing)
Start: August 19, 8:00 p.m. End: August 20, 6:00 a.m.
ONGOING
HIGHWAY 7 NB LANES CLOSED FROM CEDAR VILLA RD TO RAIL CROSSING
(Pavement markings)
Start: August 18, 7:00 p.m. End: August 19, 5:00 a.m.
MILLAR AVE ROAD CLOSED FROM CIRCLE DR E TO 45TH ST E
(Road resurfacing)
Start: August 17, 7:00 p.m. End: August 19, 6:00 a.m.
ATTRIDGE DR EB CURB & CENTRE LANES CLOSED FROM CIRCLE DR E TO CENTRAL AVE
(Paving)
Start: August 17, 7:00 a.m. End: August 19, 7:00 a.m.
COLLEGE DR EB & WB MEDIAN LANES CLOSED FROM MUNROE AVE N TO WIGGINS AVE N
(Water main maintenance)
Start: July 21, 9:00 a.m. End: August 19, 7:00 a.m.
COLLEGE DR EB LANES CLOSED FROM WIGGINS AVE N TO CUMBERLAND AVE N
(Water main maintenance)
Two-way traffic will be maintained in WB lanes
Start: July 21, 9:00 a.m. End: August 19, 7:00 a.m.
MCORMOND DR NB CURB LANE CLOSED FROM STENSRUD RD TO BALTZAN BLVD
(Construction)
Start: August 8, 8:00 a.m. End: August 19, 5:00 p.m.
MELVILLE ST INTERSECTION CLOSED AT PORTAGE AVE
(Construction)
Start: July 31, 7:00 a.m. End: August 26, 5:00 p.m.
11TH ST W EB LANES CLOSED FROM CRESCENT BLVD TO FAIRLIGHT DR
(Infrastructure improvements)
Start: July 31, 7:00 a.m. End: August 28, 4:00 p.m.
MCORMOND DR SB CURB LANE/RIGHT TURN LANE CLOSED FROM MCCRORY LINK TO FEDORUK DR
(Streetscaping)
Start: July 26, 7:00 a.m. End: August 29, 4:30 p.m.
20TH ST W EB CURB LANE CLOSED AT AVE E S
(Water main work)
Start: August 7, 7:00 a.m. End: September 3, 4:30 p.m.
7TH AVE N ROAD CLOSED FROM OSBORNE ST TO WINDSOR ST
(Water main maintenance)
Start: August 8, 7:00 a.m. End: September 8, 5:00 p.m.
KENSINGTON GATE INTERSECTION CLOSED AT NEAULT RD
(Construction)
Start: May 2, 9:00 a.m. End: August 31, 4:00 p.m.
8TH ST E ROAD CLOSED FROM MCORMOND DR TO ZIMMERMAN RD
(Road construction)
No access to Zimmerman Rd from 8th St
Start: June 10, 7:00 a.m. End: October 31, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM TASKAMANWA ST TO 8TH ST E
(Construction)
Use McOrmond Dr
Start: November 20, 7:00 a.m. End: November 18, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Weekend Road Report - August 17-18, 2024
August 16, 2024 - 2:30pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
ATTRIDGE DR EB CURB & CENTRE LANES CLOSED FROM CIRCLE DR E TO CENTRAL AVE
(Paving)
Start: August 17, 7:00 a.m. End: August 19, 7:00 a.m.
IDYLWYLD DR S SB LANES CLOSED FROM 21ST ST W TO 19TH ST W
(Sanitary main repairs)
20th St EB closed as well
Start: August 17, 9:00 a.m. End: August 17, 4:00 p.m.
20TH ST W EB LANES CLOSED AT IDYLWYLD DR S
(Sanitary main repairs)
Start: August 17, 9:00 a.m. End: August 17, 4:00 p.m.
HIGHWAY 7 SB MEDIAN LANE CLOSED FROM 22ND ST W TO 11TH ST W
(Pavement markings)
Start: August 17, 7:00 p.m. End: August 18, 6:30 a.m.
MILLAR AVE ROAD CLOSED FROM CIRCLE DR E TO 45TH ST E
(Road resurfacing)
Start: August 17, 7:00 p.m. End: August 19, 6:00 a.m.
22ND ST E CLOSED FROM 1ST AVE S TO 4TH AVE S
(Rock 102 Show & Shine)
Start: August 18, 4:00 a.m. End: August 18, 6:00 p.m.
1ST AVE S CLOSED FROM 20TH ST E TO 22ND ST E
(Rock 102 Show & Shine)
Start: August 18, 4:00 a.m. End: August 18, 6:00 p.m.
2ND AVE S CLOSED FROM 20TH ST E TO 23RD ST E
(Rock 102 Show & Shine)
Start: August 18, 4:00 a.m. End: August 18, 6:00 p.m.
3RD AVE S CLOSED FROM 20TH ST E TO 23RD ST E
(Rock 102 Show & Shine)
Start: August 18, 4:00 a.m. End: August 18, 6:00 p.m.
COLLEGE DR EB CURB LANE CLOSED FROM CENTRAL AVE TO MCKERCHER DR
(Pole replacements)
Start: August 18, 6:30 a.m. End: August 18, 12:30 p.m.
33RD ST E WB LANES CLOSED FROM 1ST AVE N TO QUEBEC AVE
(Roadway patching)
Two-way traffic will be maintained in EB lanes
Start: August 18, 7:00 a.m. End: August 18, 3:00 p.m.
CUMBERLAND AVE N SB LANES CLOSED AT MAIN ST
(Roadway patching)
Two-way traffic will be maintained in NB lanes
Start: August 18, 7:00 a.m. End: August 18, 3:00 p.m.
CLARENCE AVE N SB LANES CLOSED FROM 9TH ST E TO MAIN ST
(Roadway patching)
Two-way traffic will be maintained in NB lanes
Start: August 18, 7:00 a.m. End: August 18, 3:00 p.m.
33RD ST W WB LANES CLOSED FROM AVE P N TO AVE W N
(Roadway patching)
Start: August 18, 7:00 a.m. End: August 18, 3:00 p.m.
33RD ST W WB LANES & EB MEDIAN LANE CLOSED AT VALENS DR
(Roadway patching)
Start: August 18, 7:00 a.m. End: August 18, 5:00 p.m.
HIGHWAY 7 NB LANES CLOSED FROM CEDAR VILLA RD TO RAIL CROSSING
(Pavement markings)
Start: August 18, 7:00 p.m. End: August 19, 5:00 a.m.
ONGOING
CIRCLE DR E WB CURB & CENTRE LANES CLOSED FROM PRESTON AVE N TO WARMAN RD
(Pavement markings)
Start: August 16, 7:00 a.m. End: August 17, 5:00 a.m.
CIRCLE DR E WB CENTRE LANES CLOSED FROM SPADINA CRES E TO WARMAN RD
(Pavement markings)
Start: August 16, 7:00 p.m. End: August 17, 5:00 a.m.
CIRCLE DR E WB PARTIAL LANE CLOSURE FROM WARMAN RD TO MILLAR AVE
(Pavement markings)
Start: August 16, 7:00 p.m. End: August 17, 5:00 a.m.
SPADINA CRES W ROAD CLOSED FROM AVE A S TO AVE E S
(YXE Urban Games)
Start: August 15, 7:00 a.m. End: August 18, 6:00 p.m.
COLLEGE DR EB & WB MEDIAN LANES CLOSED FROM MUNROE AVE N TO WIGGINS AVE N
(Water main maintenance)
Start: July 21, 9:00 a.m. End: August 19, 7:00 a.m.
COLLEGE DR EB LANES CLOSED FROM WIGGINS AVE N TO CUMBERLAND AVE N
(Water main maintenance)
Two-way traffic will be maintained in WB lanes
Start: July 21, 9:00 a.m. End: August 19, 7:00 a.m.
MCORMOND DR NB CURB LANE CLOSED FROM STENSRUD RD TO BALTZAN BLVD
(Construction)
Start: August 8, 8:00 a.m. End: August 19, 5:00 p.m.
MELVILLE ST INTERSECTION CLOSED AT PORTAGE AVE
(Construction)
Start: July 31, 7:00 a.m. End: August 26, 5:00 p.m.
11TH ST W EB LANES CLOSED FROM CRESCENT BLVD TO FAIRLIGHT DR
(Infrastructure improvements)
Start: July 31, 7:00 a.m. End: August 28, 4:00 p.m.
MCORMOND DR SB CURB LANE/RIGHT TURN LANE CLOSED FROM MCCRORY LINK TO FEDORUK DR
(Streetscaping)
Start: July 26, 7:00 a.m. End: August 29, 4:30 p.m.
20TH ST W EB CURB LANE CLOSED AT AVE E S
(Water main work)
Start: August 7, 7:00 a.m. End: September 3, 4:30 p.m.
7TH AVE N ROAD CLOSED FROM OSBORNE ST TO WINDSOR ST
(Water main maintenance)
Start: August 8, 7:00 a.m. End: September 8, 5:00 p.m.
KENSINGTON GATE INTERSECTION CLOSED AT NEAULT RD
(Construction)
Start: May 2, 9:00 a.m. End: August 31, 4:00 p.m.
8TH ST E ROAD CLOSED FROM MCORMOND DR TO ZIMMERMAN RD
(Road construction)
No access to Zimmerman Rd from 8th St
Start: June 10, 7:00 a.m. End: October 31, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM TASKAMANWA ST TO 8TH ST E
(Construction)
Use McOrmond Dr
Start: November 20, 7:00 a.m. End: November 18, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Fairlight Drive intersection closed at 11th Street starting on Monday
August 16, 2024 - 11:00am
Fairlight Drive will be closed at 11th Street starting on Monday, August 19, at 7:00 a.m. for construction. Detours will be in place guiding motorists around the work zone. This project is expected to take five days to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Downtown road closures for Rock 102 Show & Shine on Sunday
August 16, 2024 - 8:00am
- 1st Avenue between 20th and 22nd streets
- 2nd Avenue between 20th and 23rd streets
- 3rd Avenue between 20th and 23rd streets
22nd Street will be closed between 1st and 4th avenues on Sunday, August 18 starting at 4:00 a.m. for the Rock 102 Show & Shine event.
Additional road closures include:
Detours will be in place guiding motorists around the event zone. The roadways are expected to reopen by 6:00 p.m.
Saskatoon Transit will be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Millar Avenue closed from Circle Drive to 45th Street starting on Saturday
August 16, 2024 - 7:00am
Millar Avenue will be closed between Circle Drive and 45th Street starting on Saturday, August 17, at 7:00 p.m. for road resurfacing. Detours will be in place guiding motorists around the work zone. This project is expected to take two nights to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.