News Releases
Saskatoon Fire - News Releases
Saskatoon Transit service adjustments – effective May 29, 2022
May 24, 2022 - 8:22am
Starting Sunday, May 29, 2022, three Saskatoon Transit routes will experience changes to provide improved reliability and connectivity to the system.
Route 1 - Exhibition
Route 1 will incorporate a part of Route 20, which includes Brand Road, Melville Street and South Industrial. With this extension of service, regular frequency and service throughout the day will become available to the Auto Mall Village and South Industrial.
Route 20 – South Industrial
The South Industrial portion of the Route 20 will be replaced with the Route 1 extension.
Route 13 - Avalon / Lawson Heights
From July through to August, Route 13 is expected to be impacted at 12th Street and University Drive due to summer construction. A planned detour will move Route 13 to 8th Street and Clarence Avenue. Route 13 will continue to service Broadway Avenue south of 8th Street, with additional frequency along Clarence Avenue.
Transit customers are encouraged to learn about the route changes by going to the website, calling the Transit Customer Service Centre at 306-975-3100 or using the transit app to plan their trip.
Riders are encouraged to plan their trip in advance and review the updated schedules before travelling. Riders can pin the routes they use most often in the transit app to get push notifications of service alerts.
Evening expressway sweeping starts tonight
May 24, 2022 - 7:19am
City and contractor crews have been busy sweeping up road debris to clean streets and reduce dust in the air since the snow melted. Starting tonight, Tuesday, May 24, motorists should expect delays on expressways, including Circle Drive, Monday to Thursday evenings from 8:00 p.m. to 6:00 a.m. This project is expected to be completed by June 2nd , weather permitting and barring any unforeseen circumstances.
Motorists should stay back a minimum of 15 metres (about 2.5 car lengths), and when passing, should use extreme caution and slow to 60 km/h. The street sweeping vehicles will travel with a Saskatoon Police Service escort to enforce speeding and other work zone infractions. On and off ramps will be temporarily closed while sweeping is being completed.
Saskatoon Police Service and pilot vehicles will use flashing lights to warn drivers to slow down as they approach the moving work zone. Motorists must slow down and respect all work zones, including mobile work zones, detours, flashing lights, barriers and workers outside of equipment.
The km/h charge for travelling in excess of the posted speed limit in a construction zone is double. Driving 20 km/h over the speed limit will cost you $440; 40 km over will cost $1,008.
The City thanks motorists for their patience while this necessary work is carried out.
Daily Road Report, May 24, 2022
May 20, 2022 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
CIRCLE DR E EB CURB LANE CLOSED FROM IDYLWYLD DR N TO 1ST AVE N
(Roadway resurfacing)
Start: May 24, 7:00 a.m. End: June 2, 5:00 p.m.
22ND ST W WB CURB LANE CLOSED FROM AVE D N TO AVE E N
(Driveway construction)
Start: May 24, 8:00 a.m. End: May 27, 5:00 p.m.
8TH ST E EB & WB MEDIAN LANES CLOSED FROM PRESTON AVE S TO GARRISON CRES
(Streetlight repair)
Start: May 24, 9:00 a.m. End: May 24, 3:00 p.m.
CONFEDERATION DR NB & SB MEDIAN LANES CLOSED FROM JOHN A MACDONALD RD TO JOHN A MACDONALD RD
(Sewer lining)
Start: May 24, 9:00 a.m. End: May 24, 3:00 p.m.
TAYLOR ST E EB LANES CLOSED FROM WIGGINS AVE S TO EWART AVE
(Roadway patching)
Start: May 24, 9:00 a.m. End: May 24, 3:00 p.m.
TAYLOR ST E WB PARKING & CURB LANES CLOSED FROM ACADIA DR TO CIRCLE DR E
(Road resurfacing)
Start: May 24, 9:00 a.m. End: May 30, 4:00 p.m.
ONGOING
TAYLOR ST E WB SIDEWALK, PARKING & CURB LANES CLOSED FROM MCKERCHER DR TO KINGSMERE BLVD
(Road resurfacing)
Start: May 16, 9:00 a.m. End: May 24, 4:30 p.m.
RUTH ST E EB PARKING LANE FROM MELROSE AVE TO BROADWAY AVE
(Sidewalk replacement)
Start: May 6, 7:00 a.m. End: May 24, 5:00 p.m.
20TH ST W ROAD CLOSED FROM AVE U S TO AVE V S
(Water main rehabilitation)
Start: May 13, 9:00 a.m. End: May 30, 4:00 p.m.
33RD ST E EB RIGHT TURN BAY & CURB LANE CLOSED AT 3RD AVE N
(Intersection improvements)
Start: May 9, 7:00 a.m. End: May 30, 5:00 p.m.
2ND AVE N NB & SB MEDIAN LANES CLOSED FROM 25TH ST E TO QUEEN ST
(Sandblasting)
Start: May 19, 7:00 a.m. End: May 31, 5:00 p.m.
SPADINA CRES E ROAD CLOSED FROM 25TH ST E TO QUEEN ST
(Bridge repairs)
Start: May 9, 7:00 a.m. End: June 22, 5:00 p.m.
DUNDONALD AVE ROAD CLOSED FROM 11TH ST W TO MOUNTBATTEN ST
(Storm sewer lining)
Start: April 28, 7:00 a.m. End: June 23, 6:00 p.m.
8TH ST E INTERSECTION CLOSED BRIGHTON BLVD
(Construction)
Start: May 9, 9:00 a.m. End: July 11, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
Preston Avenue closed between Willis Crescent and Cornish Road on Friday
May 19, 2022 - 9:00am
Preston Avenue will be closed between Willis Crescent and Cornish Road on Friday, May 20, at 9:00 a.m. for streetlight pole replacement work. Detours will be in place guiding motorists around this detour. This project is expected to take three hours to complete, barring any unforeseen circumstances or weather delays.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Central Avenue closed between 105th and 107th streets on Friday
May 19, 2022 - 8:00am
Central Avenue will be closed between 105th and 107th streets on Friday, May 20, at 9:00 a.m. for sewer lining work. The intersection at Central Avenue and 106th Street will be closed during this project. Detours will be in place guiding motorists around the work zone. This project is expected to take six hours to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Celebrating Victoria Day with fireworks
May 19, 2022 - 7:00am
- Carefully read and follow the manufacturer instructions.
- Exercise increased caution when handling and discharging any type of firework.
- Choose your location wisely. Fireworks can only be discharged on private property. Familiarize yourself with the space requirements for the type of firework being discharged. Requirements vary depending on the firework type.
- Ensure your location is free of overhead obstructions, is clear side-to-side and is a safe distance from combustible materials.
- Ensure that it is not windy and that all spectators are safely located to observe the display.
- Be sure to properly stabilize the firework according to manufacturer direction.
- Other than sparklers, never light or hold a lit firework in your hand.
- Always light the fuse at its tip.
- Never try to relight or fix the fuse on fireworks that did not go off.
- Have a supply of water available and use it to extinguish debris or smouldering embers before they cause injuries, property damage and/or fires.
- Keep in mind that you are solely responsible for any debris that may land on spectators or another’s property.
The Saskatoon Fire Department would like to remind residents and visitors of safe practices for purchasing, enjoying and disposing of fireworks. This Victoria Day, low-hazard fireworks can only be discharged on private property between the hours of dusk and 11:00 p.m. on Monday, May 23.
Low-hazard fireworks are designed for public recreational use. These fireworks travel less than 50m (160ft) high and include items such as roman candles, sparklers, fountains, wheels, volcanoes, mines and snakes.
High-hazard fireworks are designed for professionals and can only be purchased by persons holding a valid Fireworks Supervisor – Level I or Level II card issued by Natural Resources Canada.
Residents and spectators are reminded of the risks and obligations associated with fireworks:
For more information about fireworks safety, please visit saskatoon.ca/fireworks.
The Saskatoon Fire Department wishes everyone a safe and enjoyable Victoria Day!
Daily Road Report - May 19, 2022
May 18, 2022 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
20TH ST E WB CURB LANE CLOSED FROM 1ST AVE S TO IDYLWYLD DR S
(Crane setup)
Start: May 19, 7:00 a.m. End: May 19, 3:00 p.m.
2ND AVE N NB & SB MEDIAN LANES CLOSED FROM 25TH ST E TO QUEEN ST
(Sandblasting)
Start: May 19, 7:00 a.m. End: May 31, 5:00 p.m.
CONFEDERATION DR VARIOUS NB & SB LANES CLOSED FROM 33RD ST W TO JOHN A MACDONALD RD
(Environmental monitoring)
Start: May 19, 9:00 a.m. End: May 19, 1:00 p.m.
22ND ST E WB LANES CLOSED FROM AVE D N TO AVE F N
(Connections)
Start: May 19, 9:00 a.m. End: May 20, 3:00 p.m.
AVE H N ROAD CLOSED FROM 31ST ST W TO 33RD ST W
(Roadway patching)
Start: May 19, 10:00 a.m. End: May 19, 1:00 p.m.
NIGHTWORK
MCORMOND DR EB & WB LANE RESTRICTIONS AT KENASCHUK CR
(Road Painting)
Start: May 16, 7:00 p.m. End: May 20, 7:00 a.m.
CENTRAL AVE NB & SB LANE RESTRICTIONS FROM ATTRIDGE DR TO MCORMOND DR
(Road Painting)
Start: May 16, 7:00 p.m. End: May 20, 7:00 a.m.
ONGOING
20TH ST W ROAD CLOSED FROM AVE U S TO AVE V S
(Water main rehabilitation)
Start: May 13, 9:00 a.m. End: May 20, 4:00 p.m.
RUTH ST E INTERSECTION CLOSED AT YORK AVE
(Construction)
Start: May 9, 7:00 a.m. End: May 20, 5:00 p.m.
TAYLOR ST E WB PARKING & CURB LANES CLOSED FROM MCKERCHER DR TO KINGSMERE BLVD
(Road resurfacing)
Start: May 16, 9:00 a.m. End: May 22, 4:30 p.m.
RUTH ST E EB PARKING LANE FROM MELROSE AVE TO BROADWAY AVE
(Sidewalk Replacement)
Start: May 6, 7:00 a.m. End: May 24, 5:00 p.m.
33RD ST E EB RIGHT TURN BAY & CURB LANE CLOSED AT 3RD AVE N
(Intersection improvements)
Start: May 9, 7:00 a.m. End: May 30, 5:00 p.m.
SPADINA CRES E ROAD CLOSED FROM 25TH ST E TO QUEEN ST
(Bridge repairs)
Start: May 9, 7:00 a.m. End: June 22, 5:00 p.m.
DUNDONALD AVE ROAD CLOSED FROM 11TH ST W TO MOUNTBATTEN ST
(Storm sewer work)
Start: April 28, 7:00 a.m. End: June 23, 6:00 p.m.
8TH ST E INTERSECTION CLOSED AT BRIGHTON BLVD
(Construction)
Start: May 9, 9:00 a.m. End: July 11, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
Avenue H closed between 31st and 33rd streets on Thursday
May 18, 2022 - 5:10am
Avenue H will be closed between 31st and 33rd streets on Thursday, May 19, at 10:00 a.m. for roadway patching work. The intersection at Avenue H and 32nd Street will remain open during this project. Detours will be in place guiding motorists around the work zone. This project is expected to take three hours to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Daily Road Report - May 18, 2022
May 17, 2022 - 7:42am
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
IDYLWYLD DR N SB CURB LANE CLOSED FROM 51ST ST E TO CIRCLE DR E
(Guardrail repairs)
Start: May 18, 9:00 a.m. End: May 18, 12:00 p.m.
DIEFENBAKER DR SB PARKING & CURB LANE CLOSED AT CENTENNIAL DR
(Roadway patching)
Start: May 18, 9:00 a.m. End: May 18, 3:00 p.m.
IDYLWYLD DR S SB CURB LANE CLOSED FROM SASKATCHEWAN CRES E TO 8TH ST E
(Pole replacements)
Start: May 18, 9:30 a.m. End: May 18, 3:30 p.m.
CIRCLE DR S EB CURB LANE CLOSED AT DIEFENBAKER PARK RD
(Guardrail repair)
Start: May 18, 12:00 p.m. End: May 18, 3:00 p.m.
NIGHTWORK
MCORMOND DR EB & WB LANE RESTRICTIONS AT KENASCHUK CR
(Road Painting)
Start: May 16, 7:00 p.m. End: May 20, 7:00 a.m.
CENTRAL AVE NB & SB LANE RESTRICTIONS FROM ATTRIDGE DR TO MCORMOND DR
(Road Painting)
Start: May 16, 7:00 p.m. End: May 20, 7:00 a.m.
ONGOING
2ND AVE N NB CURB LANE & PARKING LANE CLOSED FROM 25TH ST E TO QUEEN ST
(Concrete work)
Start: May 12, 7:00 a.m. End: May 18, 5:00 p.m.
20TH ST W ROAD CLOSED FROM AVE U S TO AVE V S
(Water main rehabilitation)
Start: May 13, 9:00 a.m. End: May 20, 4:00 p.m.
RUTH ST E INTERSECTION CLOSED AT YORK AVE
(Construction)
Start: May 9, 7:00 a.m. End: May 20, 5:00 p.m.
TAYLOR ST E WB PARKING & CURB LANES CLOSED FROM MCKERCHER DR TO KINGSMERE BLVD
(Road resurfacing)
Start: May 16, 9:00 a.m. End: May 22, 4:30 p.m.
RUTH ST E EB PARKING LANE FROM MELROSE AVE TO BROADWAY AVE
(Sidewalk Replacement)
Start: May 6, 7:00 a.m. End: May 24, 5:00 p.m.
33RD ST E EB RIGHT TURN BAY & CURB LANE CLOSED AT 3RD AVE N
(Intersection improvements)
Start: May 9, 7:00 a.m. End: May 30, 5:00 p.m.
SPADINA CRES E ROAD CLOSED FROM 25TH ST E TO QUEEN ST
(Bridge repairs)
Start: May 9, 7:00 a.m. End: June 22, 5:00 p.m.
DUNDONALD AVE ROAD CLOSED FROM 11TH ST W TO MOUNTBATTEN ST
(Storm sewer work)
Start: April 28, 7:00 a.m. End: June 23, 6:00 p.m.
8TH ST E INTERSECTION CLOSED AT BRIGHTON BLVD
(Construction)
Start: May 9, 9:00 a.m. End: July 11, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Digital Zoning Bylaw Now Available
May 17, 2022 - 10:00am
Starting May 17, 2022, finding information on zoning anywhere in Saskatoon can now be done online through the City of Saskatoon’s new Digital Zoning Bylaw system. The online version of Bylaw 8770 – Zoning Bylaw, 2009, will make it easier to find information on specific areas of the city, through an easy-to-navigate interface as well as interactive maps.
Previously, the Zoning Bylaw was only available in a print/pdf format that was 525 pages long and could be difficult to use to find specific information. Now, by going to saskatoon.ca/digitalzoningbylaw, builders, homeowners and anyone else can easily find the information they need. Future versions of the Digital Zoning Bylaw will include a search function and other improved functionalities.
Implementation of the Digital Zoning Bylaw supports the City of Saskatoon’s strategic plan by improving service to enhance economic development and provide greater transparency to the public around planning and development. If there is any discrepancy between the digital version of the bylaw and the written version, the written version will remain the legal document.
For more information, please visit saskatoon.ca/zoningbylaw, or email zoningbylaw@saskatoon.ca.