News Releases
Saskatoon Fire - News Releases
Daily Road Report - November 10, 2021
November 9, 2021 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
TAYLOR ST E SB SHOULDER CLOSED AT CIRCLE DR E
(Landscaping)
Start: November 10, 7:00 a.m. End: November 10, 5:00 p.m.
RUTH ST E ROAD CLOSED FROM JARVIS DR TO LOUISE AVE
(Connection repair)
Start: November 10, 8:00 a.m. End: November 10, 5:00 p.m.
CIRCLE DR E VARIOUS NB & SB SINGLE LANE CLOSURES FROM HIGHWAY 11 TO TAYLOR ST E
(Streetlight replacement)
Start: November 10, 9:00 a.m. End: November 10, 12:00 p.m.
CONFEDERATION DR NB & SB VARIOUS LANES AT 33RD ST W
(Groundwater monitoring)
Start: November 10, 9:00 a.m. End: November 10, 5:00 p.m.
TAYLOR ST E EB/WB, NB & SB RIGHT TURN LANES CLOSED AT CIRCLE DR E
(Junction box replacements)
Start: November 10, 10:00 a.m. End: November 10, 3:00 p.m.
CIRCLE DR E WB CURB LANE ROLLING CLOSURE FROM PEMBINA PL TO WARMAN RD
(Streetlight pole replacements)
Start: November 10, 1:30 p.m. End: November 10, 3:30 p.m.
ONGOING
NEAULT RD NB & SB SPEED REDUCTION FROM 22ND ST W TO 33RD ST W
(Water Main installation)
Start: October 29, 7:00 a.m. End: November 10, 5:00 p.m.
CIRCLE DR WB SPEED REDUCTION FROM LORNE AVE TO GORDIE HOWE BRIDGE
(Construction)
Start: November 8, 7:00 a.m. End: November 10, 5:00 p.m.
20TH ST E EB & WB MEDIAN LANES CLOSED FROM 2ND AVE S TO 4TH AVE S
(Roadwork)
Start: November 3, 7:00 a.m. End: November 12, 4:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
City’s first Flood Control Strategy project substantially complete
November 9, 2021 - 8:07am
In 2018, City Council approved a Flood Control Strategy (FCS) aimed at reducing flooding in Saskatoon’s most flood-prone areas during intense rainfalls. The dry storm pond at W.W. Ashley District Park, which took approximately ten months to build, is now substantially complete and will catch overflow but also serve as a sports field and park space when dry.
“The landscaping turned out beautifully with trees, a surrounding pathway, and spectator seating built into the slopes,” says Russ Munro, Director of Saskatoon Water. “We are very pleased with the end result and, while none of us want to experience excessive amounts of rain within very short periods of time, that is when we will see the new pond and underground drainage systems in action.”
Substantial completion means there’s still some finishing touches to be done before the site can open, like installing stair railings and park benches. The site will remain closed until approximately fall 2022 to give the newly installed sod and seed time to establish. In the meantime, Saskatoon Water is gearing up for the second of nine FCS projects: constructing a dry storm pond in Churchill Park.
“Consultations have taken place and we have received great feedback from the community. We have moved forward with design plans and will proceed with construction in early 2022.”
Dry storm ponds are designed to hold water that would otherwise cause nearby flooding during intense rainfalls. The water flows from properties and roads into the dry storm pond, then slowly drains into the storm sewer. Prior to the establishment of the FCS, Saskatoon already had nine dry storm ponds, mostly in neighbourhoods built after 1989 when enhanced storm water infrastructure standards were established. The FCS focuses on neighbourhoods that were established prior to then.
The Government of Canada is contributing 40% of the eligible construction costs up to a maximum of $21.6 million toward nine FCS projects. The City is funding the remaining construction costs through the Storm Water Utility Capital Program and revenue generated from Storm Water Utility charges.
For more information about the FCS, and to subscribe to Flood Protection Plan updates, visit saskatoon.ca/floodplan.
Civic Services & Holiday Hours for Remembrance Day, Thursday, November 11
November 9, 2021 - 2:54am
- All Administrative Offices are closed on Thursday, November 11. City Hall will reopen Friday, November 12, at 8:00 a.m.
- Remai Modern is open from 10:00 a.m. to 5:00 p.m.
- Garbage (Black Cart) – Collections as scheduled
- Recycling (Blue Cart) – Collections as scheduled
- Organics (Subscription Green Cart) – The 2021 collections season has ended. Registration for next season will open in January 2022.
- The Landfill will be open from 7:30 a.m. to 5:00 p.m.
- Both compost depots are closed for the season and will re-open in April 2022.
- Fixed route transit will run on holiday hours and there will be no On-Demand Transit. Please consult the mobile app transit to plan your trip.
- Access Transit will operate on holiday hours (8:30 a.m. – 11:00 p.m.) and the Transit Customer Service Centre will be closed for walk-in customers but phone line will be open from 9:00 a.m. – 6:00 p.m. (closed from 1:00 p.m. – 2:00 p.m.).
- Parking payment is not required on Remembrance Day.
- Motorists are reminded that all other parking requirements remain in effect, including parking time limits.
- Impound Lot will be closed to the public.
- Zoo 10:00 a.m. – 4:00 p.m.
- Forestry Farm Park 7:30 a.m. – 4:30 p.m.
- Cosmo Civic Centre
CLOSED - Harry Bailey Aquatic Centre
OPEN - 12:00 p.m. to 9:00 p.m. - Lakewood Civic Centre
OPEN – 12:00 p.m. to 9:00 p.m. - Lawson Civic Centre
OPEN - 12:00 p.m. to 5:00 p.m. - Saskatoon Field House
OPEN – 12:00 p.m. to 5:00 p.m. - Shaw Centre
OPEN - 12:00 p.m. to 9:00 p.m. - Terry Fox Track
CLOSED
The City of Saskatoon will have a number of adjusted civic services and hours of operation on Remembrance Day, as follows:
CITY HALL
REMAI MODERN
WASTE COLLECTIONS
LANDFILL
COMPOST DEPOTS
SASKATOON TRANSIT
PAY PARKING
MUNICIPAL IMPOUND LOT
SASKATOON FORESTRY FARM PARK & ZOO
Regular Hours of Operation:
LEISURE CENTRES
Search for drop-in program information including fitness and weight room hours, public swim sessions and fitness programs on Leisure Online at saskatoon.ca/leisureonline
INDOOR ARENAS
Open at 12:00 pm.
Parent & Tot Skating at ACT 2:30 p.m. to 3:15 p.m.
Public Skating at Cosmo 12:00 p.m. to 1:00 p.m.
NOTIFYNOW
Residents are encouraged to sign-up to notifynow for timely and targeted public safety messages. Notifynow is a free service. Tell us how to best reach you on your preferred communication device. Visit saskatoon.ca/notifynow for more information.
YXE Service Alerts
For information and updates on service disruptions such as power or water check saskatoon.ca/servicealerts or follow @yxeservicealert on Twitter
Ruth Street closed between Jarvis and Louise avenues on Wednesday
November 9, 2021 - 8:00am
Ruth Street will be closed between Jarvis and Louise avenues on Wednesday, November 10, at 8:00 a.m. for connection repair work. Detours will be in place guiding motorists around the work zone. This project is expected to take one day to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information is available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Inland Steel secures deal in Marquis Industrial: Avenue P yards to close
November 8, 2021 - 3:30pm
Saskatoon Land and Inland Steel Products have reached an agreement on a parcel in the Marquis Industrial area which will lead to the relocation of the company’s current operations at Avenue P and 17th Street West.
“Reaching this land agreement with Saskatoon Land creates the opportunity for our company to build a new headquarters and state-of-art metal recycling facility in Saskatoon, where our family business was formed 55 years ago,” says Matt Ditlove, President of Inland Steel Products. “This investment demonstrates our company’s continued commitment to serving the people of Saskatoon and surrounding area, and to the creation of additional jobs for our community.”
The new expanded metal recycling facility on the Marquis lands will ensure a fast and stress-free experience for recycling scrap metal in Saskatoon, for both industrial vendors and individuals. Furthermore, the state-of-the-art processing equipment will increase the company’s ability to recycle more volume and continue to grow the company’s ability to service clients throughout Saskatchewan.
Mayor Charlie Clark says Inland’s decision demonstrates confidence in Saskatoon’s future, which is especially welcome as we come through the pandemic.
“This project is a big win-win for the community and for Inland Steel. It is a great commitment by Inland Steel to continue to grow this company and create good jobs right here in Saskatoon, as they expand their activities across the continent. Moving their activities from Avenue P to the North Industrial will also reduce heavy industrial activity close to the homes and schools in that area, which has been a long term goal for the city.”
The City had three parcels that total nearly 12.4 hectares (30.6 acres including a 10.7 ha or 26.4 acre industrial site) which had been held back from the market with the strategy that it would attract a heavy industrial buyer such as Inland Steel Products to foster expansion, relocation and job creation in the region.
“These parcels are shovel-ready,” says Frank Long, Director of Saskatoon Land. “All are fully serviced and immediately available for construction.”
The land deal will set in motion the opportunity to have the current Inland Steel site rezoned for light industrial uses.
“We’ve wanted to move away from heavy industrial uses in this area for many years,” says Director of Planning and Development, Lesley Anderson. “With Inland’s eventual departure, future land use on the site as a light industrial use will be a better fit with the surrounding residential neighbourhoods.”
Daily Road Report - November 9, 2021
November 8, 2021 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
TAYLOR ST E EB & WB MEDIAN LANE CLOSED FROM CIRCLE DR E TO MCKERCHER DR
(Sewer inspection)
Start: November 9, 8:00 a.m. End: November 9, 4:00 p.m.
20TH ST W EB PARKING & CURB LANES CLOSED FROM AVE B S TO IDYLWYLD DR S
(Billboard work)
Start: November 9, 9:00 a.m. End: November 9, 1:00 p.m.
33RD ST W EB CURB LANE CLOSED FROM AVE W N TO CIRCLE DR W
(Traffic pole install)
Start: November 9, 10:30 a.m. End: November 9, 4:30 p.m.
ONGOING
NEAULT RD NB & SB SPEED REDUCTION FROM 22ND ST W TO 33RD ST W
(Water Main installation)
Start: October 29, 7:00 a.m. End: November 10, 5:00 p.m.
CIRCLE DR WB SPEED REDUCTION FROM LORNE AVE TO GORDIE HOWE BRIDGE
(Construction)
Start: November 8, 7:00 a.m. End: November 10, 5:00 p.m.
20TH ST E EB & WB MEDIAN LANES CLOSED FROM 2ND AVE S TO 4TH AVE S
(Roadwork)
Start: November 3, 7:00 a.m. End: November 12, 4:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
-30-
City recognizes National Indigenous Veterans Day
November 8, 2021 - 8:39am
November 8th is National Indigenous Veterans Day; a day to recognize the historic and present-day military service contributions of Indigenous people.
It has been estimated that as many as 12,000 First Nations, Métis, and Inuit people served in the great conflicts of the 20th century and at least 500 lost their lives. Indigenous people have had to overcome many challenges to serve in uniform—from learning a new language and adapting to cultural differences, to travelling great distances from their remote communities just to enlist.
Indigenous men and women have continued to serve in uniform in the post-war years as well. For example, by fulfilling North Atlantic Treaty Organization (NATO) duties in Europe during the Cold War and serving with United Nations and other multinational peace support operations around the world. In more recent years, many Indigenous Canadian Armed Forces members saw hazardous duty in Afghanistan.
Closer to home, Indigenous military personnel have filled a wide variety of roles, including serving with the Canadian Rangers. This group of army reservists is active predominantly in the North, as well as on remote stretches of our east and west coasts. The Rangers use their intimate knowledge of the land there to help maintain a national military presence in these difficult-to-reach areas, monitoring the coastlines and assisting in local rescue operations.
Saskatoon Mayor Charlie Clark says: “Today we recognize the service and sacrifice of Indigenous veterans in our country. Despite facing the harms from government policy that we continue to come to terms with, thousands of Indigenous men and women have signed up to serve shoulder to shoulder with their non-Indigenous neighbours. They have done this across the country and through the generations. We thank them for this service to our shared nation.”
The City’s Indigenous Initiatives Director, Melissa Cote, says: “Indigenous people have a long and proud tradition of serving in Canada’s military. Unfortunately, their contributions are often overlooked and underappreciated. I encourage people to take some time today to learn about the stories and contributions of Indigenous veterans and those individuals currently serving. They have demonstrated - and continue to demonstrate - bravery, courage, and leadership.”
City announces several public artwork installations in Saskatoon
November 8, 2021 - 10:00am
The City is pleased to announce several recent public artwork installations at various locations throughout the Downtown, Riversdale and Broadway areas:
“Make a Wish” by Kyle Thornley. Steel sculpture that captures the essence of resilience, growth and optimism expressed through a mature dandelion stalk and seeds, held by vibrant, colourful fingers. Located Downtown at the corner of 2nd Avenue N and 23rd Street E.
“Inner City” by Josh Jacobson. Mural highlighting an urban female jackrabbit bounding towards Saskatoon city centre. “Inner City” is 1,675 square feet in size, making it one of the largest murals in the city. Located in River Landing beneath the Senator Sid Buckwold Bridge.
“Resurgence” by Ruth Cuthand and Henry Lau, painted by Steven Paul. 3D aluminum sculpture of a buffalo cow and calf in an intimate position, representing the relationship between Indigenous people and the buffalo. Located in the Riversdale Business Improvement District (BID) at the corner of 20th Street and Avenue B.
“Carousal” by Karen Ho Fatt Lee. Two aluminum carousel-type horses coated in brightly coloured paints (orange, yellow and blue) and attached with a center pole. “Carousal” is a play on words, a merry-go-round of fun and boisterous (carousing) merrymaking. Located in the Broadway BID at the corner of Broadway Avenue and 10th Street.
“Saadat Qalbi/Miyawâtam 1” by Ruth Cuthand and Suada Jailan, curated by Dr. Jen Budney. Hand-painted aluminum sculpture composed of floral motives inspired by both Cree/Michif beadwork and traditional East African henna design. Located in the Broadway BID at the corner of Broadway Avenue and Main Street.
For more information on public art in Saskatoon, visit saskatoon.ca/publicart.
Seasonal decorations going up on city bridges on Tuesday
November 8, 2021 - 9:00am
Saskatoon Light & Power will be putting up seasonal decorations on city bridges starting tomorrow. Work will impact traffic on the following bridges:
University Bridge – Tuesday, November 9 from 9:00 a.m. to 12:00 p.m.
Broadway Bridge – Tuesday, November 9 from 1:00 p.m. to 4:00 p.m.
Due to the time it takes to install seasonal decorations, work needs to start early. Decorations will not be turned on until after November 11.
These will be moving work zones and will impact traffic in both directions. Road users are reminded to slow down in work zones and be respectful of workers.
Free transit for past & present military on Remembrance Day
November 8, 2021 - 8:00am
Saskatoon Transit is recognizing veterans and current members of the Canadian Armed Forces with free transit service on Remembrance Day.
The free bus service will be offered to armed forces veterans and current serving personnel, including cadets and reservists. Free bus service will also be provided to their one companion.
Eligible transit users can identify themselves by wearing a military uniform or presenting military ID or a CF1 card when they board.
Providing free transit to veterans and current members of the Canadian Armed Forces is a way to recognize the tremendous commitment they have made, and continue to make, to the community and country.
Saskatoon Transit buses will also display a “Lest We Forget” message on November 11.
Daily Road Report - November 8, 2021
November 5, 2021 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
CIRCLE DR WB SPEED REDUCTION FROM LORNE AVE TO GORDIE HOWE BRIDGE
(Construction)
Start: November 8, 7:00 a.m. End: November 10, 5:00 p.m.
COLLEGE DR VARIOUS EB & WB LANE CLOSURES FROM CUMBERLAND AVE N TO PRESTON AVE N
(Streetlight bulb replacement)
Start: November 8, 9:00 a.m. End: November 8, 3:00 p.m.
ATTRIDGE DR WB MEDIAN LANE CLOSED FROM FORESTRY FARM PARK DR TO REVER RD
(Road resurfacing)
Start: November 8, 11:00 a.m. End: November 8, 2:00 p.m.
ONGOING
NEAULT RD NB & SB SPEED REDUCTION FROM 22ND ST W TO 33RD ST W
(Water Main installation)
Start: October 29, 7:00 a.m. End: November 10, 5:00 p.m.
20TH ST E EB & WB MEDIAN LANES CLOSED FROM 2ND AVE S TO 4TH AVE S
(Roadwork)
Start: November 3, 7:00 a.m. End: November 12, 4:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Weekend Road Report - November 6-7, 2021
November 5, 2021 - 2:30pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
CIRCLE DR E NB CURB LANE CLOSED AT TO COLLEGE DR
(Barrier repair)
Start: November 6, 7:00 a.m. End: November 7, 7:00 p.m.
COLLEGE DR EB CURB & CENTRE LANES CLOSED FROM WIGGINS AVE N TO BOTTOMLEY AVE N
(Tree trimming)
Start: November 6, 8:00 a.m. End: November 6, 2:00 p.m.
2ND AVE S ROAD CLOSED FROM 21ST ST E TO 22ND ST E
(Crane lift)
Start: November 7, 6:30 a.m. End: November 7, 10:30 a.m.
COLLEGE DR EB & WB SPEED REDUCTION FROM CENTRAL AVE TO CIRCLE DR E
(Guide Sign Repair)
Start: November 7, 7:00 a.m. End: November 7, 2:00 p.m.
COLLEGE DR WB MEDIAN LANE CLOSED AT CENTRAL AVE
(Guide Sign Repair)
Start: November 7, 7:00 a.m. End: November 7, 2:00 p.m.
CIRCLE DR E WB CURB LANE CLOSED AT PRESTON AVE
(Barrier installation)
Start: November 7, 7:00 a.m. End: November 7, 7:00 p.m.
QUEEN ST INTERSECTION CLOSED AT 1ST AVE N
(Roadway patching)
Start: November 7, 8:00 a.m. End: November 7, 6:00 p.m.
1ST AVE N SB LANES CLOSED FROM DUKE ST TO KING ST
(Roadway patching)
Start: November 7, 8:00 a.m. End: November 7, 6:00 p.m.
8TH ST E WB CURB LANE CLOSED FROM MELROSE AVE TO MCPHERSON AVE
(Roadway patching)
Start: November 7, 9:00 a.m. End: November 7, 7:00 p.m.
8TH ST E WB CURB LANE CLOSED FROM BROADWAY AVE TO EASTLAKE AVE
(Roadway patching)
Start: November 7, 9:00 a.m. End: November 7, 7:00 p.m.
ONGOING
NEAULT RD NB & SB SPEED REDUCTION FROM 22ND ST W TO 33RD ST W
(Water Main installation)
Start: October 29, 7:00 a.m. End: November 10, 5:00 p.m.
20TH ST E EB & WB MEDIAN LANES CLOSED FROM 2ND AVE S TO 4TH AVE S
(Roadwork)
Start: November 3, 7:00 a.m. End: November 12, 4:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
1st Avenue closed between 26th and King streets on Sunday
November 5, 2021 - 8:00am
1st Avenue will be closed between 26th and King streets on Sunday, November 7, at 8:00 a.m. for roadway patching work. Queen Street will be closed between 1st and 2nd avenues during this project. Detours will be in place guiding motorists around this work. This project is expected to take 10 hours to complete, barring any unforeseen circumstances or weather delays.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information is available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
2nd Avenue closed between 21st and 22nd streets on Sunday
November 5, 2021 - 7:00am
2nd Avenue will be closed between 21st and 22nd streets on Sunday, November 7, at 6:30 a.m. for craning work. Detours will be in place guiding motorists around this work. This project is expected to take four hours to complete, barring any unforeseen circumstances or weather delays.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information is available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
CO Awareness Week: safety, symptoms and emergency preparedness
November 5, 2021 - 6:00am
During Carbon Monoxide Awareness Week (November 1-7), the Saskatoon Fire Department (SFD) wants to remind residents that carbon monoxide alarms save lives.
Carbon monoxide (CO) is a “silent killer” because it is an invisible, tasteless and odourless gas. Exposure to carbon monoxide can cause flu-like symptoms such as headaches, nausea, dizziness, burning eyes, confusion, drowsiness or loss of consciousness. In severe cases, CO poisoning can cause brain damage and death. The elderly, children and people with heart or respiratory conditions may be particularly sensitive to CO.
Recently, The Uniform Building and Accessibility Standards Regulations (the UBAS Regulations) were amended to require all Saskatchewan residential buildings to have working CO alarms (or combination CO-smoke alarms) installed by July 1, 2022. CO alarms should be installed outside each sleeping area and are most effective when interconnected throughout your home. Testing CO alarms should occur each month and the batteries replaced at least once a year. CO alarms should be replaced every seven years, or sooner according to manufacturer’s directions.
CO incidents account for approximately two per cent of SFD’s responses. Most cases involving CO are quickly mitigated; however, some require additional resources or action. Each SFD fire engine comes equipped with a CO monitor capable of determining the parts-per-million (PPM) concentration of CO in the air. Firefighter-paramedics can also measure and treat the carboxyhemoglobin level in the blood of a patient by using a non-invasive medical assessment tool on scene and immediately begin appropriate treatment if necessary.
In an emergency, seconds count; a functioning carbon monoxide alarm can be the difference in preventing a tragedy in your home. If your CO alarm is sounding or if you believe you are experiencing the effects of CO poisoning, evacuate all occupants and pets from the home and immediately call 911.
To learn more about CO, visit saskatoon.ca/carbonmonoxide.
Daily Road Report - November 5, 2021
November 4, 2021 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
No new projects are scheduled to start on this date.
ONGOING
IDYLWYLD DR S NB & SB MEDIAN LANES CLOSED FROM 11TH ST E TO SASKATCHEWAN CRES E
(Guardrail installation)
Start: November 3, 6:00 a.m. End: November 5, 2:00 p.m.
33RD ST E VARIOUS SINGLE LANE CLOSURES AT 7TH AVE N
(Environmental monitoring)
Start: November 4, 9:00 a.m. End: November 5, 2:00 p.m.
AVE H N ROAD CLOSED FROM 32ND ST W TO 33RD ST W
(Connection replacement)
Start: November 4, 9:00 a.m. End: November 5, 5:00 p.m.
CUMBERLAND AVE S ROAD CLOSED FROM 5TH ST E TO 1ST ST E
(Catch basin replacement)
Start: November 4, 8:00 a.m. End: November 5, 5:00 p.m.
NEAULT RD NB & SB SPEED REDUCTION FROM 22ND ST W TO 33RD ST W
(Water Main installation)
Start: October 29, 7:00 a.m. End: November 10, 5:00 p.m.
20TH ST E EB & WB MEDIAN LANES CLOSED FROM 2ND AVE S TO 4TH AVE S
(Roadwork)
Start: November 3, 7:00 a.m. End: November 12, 4:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Daily Road Report - November 4, 2021
November 3, 2021 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
CUMBERLAND AVE S ROAD CLOSED FROM 5TH ST E TO 1ST ST E
(Catch basin replacement)
Start: November 4, 8:00 a.m. End: November 5, 5:00 p.m.
33RD ST E VARIOUS SINGLE LANE CLOSURES AT 7TH AVE N
(Environmental monitoring)
Start: November 4, 9:00 a.m. End: November 5, 2:00 p.m.
AVE H N ROAD CLOSED FROM 32ND ST W TO 33RD ST W
(connection replacement)
Start: November 4, 9:00 a.m. End: November 5, 5:00 p.m.
CIRCLE DR E EB & WB SPEED REDUCTION FROM PRESTON AVE N TO SPADINA CRES E
(Fence repair)
Start: November 4, 10:30 a.m. End: November 4, 4:00 p.m.
ONGOING
TAYLOR ST E EB & WB MEDIAN LANES CLOSED FROM KINGSMERE BLVD TO MCKERCHER DR
(Construction)
Start: November 3, 8:00 a.m. End: November 4, 5:00 p.m.
TAYLOR ST E SB SHOULDER LANE CLOSED AT CIRCLE DR E
(Landscaping)
Start: November 1, 7:00 a.m. End: November 4, 5:00 p.m.
IDYLWYLD DR S NB & SB MEDIAN LANE CLOSED FROM 11TH ST E TO SASKATCHEWAN CRES E
(Guardrail installation)
Start: November 3, 6:00 a.m. End: November 5, 2:00 p.m.
NEAULT RD NB & SB SPEED REDUCTION FROM 22ND ST W TO 33RD ST W
(Water Main installation)
Start: October 29, 7:00 a.m. End: November 10, 5:00 p.m.
20TH ST E EB & WB MEDIAN LANES CLOSED FROM 2ND AVE S TO 4TH AVE S
(Roadwork)
Start: November 3, 7:00 a.m. End: November 12, 4:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Avenue H closed between 32nd and 33rd streets starting Thursday
November 3, 2021 - 8:00am
Avenue H will be closed between 32nd and 33rd streets starting Thursday, November 4 at 9:00 a.m. for connection repair work. Detours will be in place guiding motorists around this work. This project is expected to take two days to complete, barring any unforeseen circumstances or weather delays.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information is available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Rescheduled: Cumberland Avenue closed between 1st and 5th streets starting Thursday
November 3, 2021 - 7:00am
Cumberland Avenue will be closed between 1st and 5th streets starting Thursday, November 4, at 8:00 a.m. for catch basin replacement work. 3rd Street will be closed between Ewart and Jackson avenues during this project. Detours will be in place guiding motorists around this work. This project is expected to take two days to complete, barring any unforeseen circumstances or weather delays.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information is available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Daily Road Report - November 3, 2021
November 2, 2021 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
IDYLWYLD DR S NB & SB MEDIAN LANE CLOSED FROM 11TH ST E TO SASKATCHEWAN CRES E
(Guardrail installation)
Start: November 3, 6:00 a.m. End: November 5, 2:00 p.m.
33RD ST W EB CURB LANE CLOSED FROM EDMONTON AVE TO AVE P N
(Groundwater monitoring)
Start: November 3, 8:00 a.m. End: November 3, 4:00 p.m.
TAYLOR ST E EB & WB MEDIAN LANES CLOSED FROM KINGSMERE BLVD TO MCKERCHER DR
(Construction)
Start: November 3, 8:00 a.m. End: November 4, 5:00 p.m.
TAYLOR ST E EB LANES CLOSED FROM DUFFERIN AVE TO LANSDOWNE AVE
(Tree pruning)
Start: November 3, 9:00 a.m. End: November 3, 2:00 p.m.
ONGOING
TAYLOR ST E ROAD CLOSED AT MEADOWS PKY
(Construction)
Start: October 23, 9:00 a.m. End: November 3, 4:00 p.m.
PRESTON AVE SB CURB LANE, EB RIGHT TURN LANE & WB MEDIAN LEFT TURN LANE CLOSED AT PRESTON CROSSING INTERSECTION
(Sign installation)
Start: November 2, 8:00 a.m. End: November 3, 5:00 p.m.
TAYLOR ST E SB SHOULDER LANE CLOSED AT CIRCLE DR E
(Landscaping)
Start: November 1, 7:00 a.m. End: November 4, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM 8TH ST TO BRIGHTON COMMON
(Storm sewer work)
Start: August 30, 9:00 a.m. End: November 5, 7:00 a.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
City Council to review options for school and playground zones
November 1, 2021 - 11:08am
-
New playground zones with reduced speed limit of 30 km/h;
-
Year-round lower speed limits in both school and playground zones 7 days a week from 7 a.m. to 9 p.m.
-
Adjustments to posted signs and length of current school zones; and
-
Removal of lower speed school zones from high schools, designating them a “school area” where U-turn are still restricted.
Year-round school zones and the introduction of playground zones with reduced speed limits were endorsed at City Council’s Standing Policy Committee on Transportation today. City Council will debate the merits of the recommended options for these zones and vote at its November 22 meeting.
The recommendation would align the City’s school zone policy with national guidelines and implement other best practices for pedestrian safety, including:
There is no recommendation to develop a lower speed limit in areas with more seniors. Other measures such as traffic calming or pedestrian crossing devices will continue to be used to ensure pedestrian safety at important crossings near these facilities.
Project information is available at saskatoon.ca/engage/speed-limit-review.
Daily Road Report - November 2, 2021
November 1, 2021 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
PRESTON AVE SB CURB LANE, EB RIGHT TURN LANE & WB MEDIAN LEFT TURN LANE CLOSED AT PRESTON CROSSING INTERSECTION
(Sign installation)
Start: November 2, 8:00 a.m. End: November 3, 5:00 p.m.
CIRCLE DR E EB CURB LANE CLOSED AT PRESTON AVE N
(Streetpole replacements)
Start: November 2, 9:00 a.m. End: November 2, 1:00 p.m.
1ST AVE S SB CURB LANE CLOSED AT 20TH ST E
(Electronic work)
Start: November 2, 9:00 a.m. End: November 2, 4:00 p.m.
ONGOING
MARQUIS DR EB RAMP CLOSED TO IDYLWYLD DR SB
(Storm main repairs)
Start: November 1, 8:00 a.m. End: November 2, 6:00 p.m.
TAYLOR ST E ROAD CLOSED MEADOWS PKY
(Construction)
Start: October 23, 9:00 a.m. End: November 3, 4:00 p.m.
TAYLOR ST E SB SHOULDER LANE CLOSED AT CIRCLE DR E
(Landscaping)
Start: November 1, 7:00 a.m. End: November 4, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM 8TH ST TO BRIGHTON COMMON
(Storm sewer work)
Start: August 30, 9:00 a.m. End: November 5, 7:00 a.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
City Council defeats The COVID-19 Gathering Bylaw, 2021 No.9782
October 29, 2021 - 10:53am
- Red: 16% reduction in gathering size but no decrease in proportion of people mixing in the community.
- Olive: 43% reduction in gathering sizes but no decrease in proportion of people mixing in the community.
- Green: modest reduction in people mixing in community.
- Blue: greater reduction in people mixing in community (half of pre-pandemic mixing).
- Magenta: greater reduction in people mixing in community (half of pre-pandemic mixing).
- Proof of full COVID-19 vaccination or negative test within 72 hours are mandatory for ages 12 and over within all Leisure Centre areas and indoor arenas as per a Public Health Order and subsequent Council direction.
- A Public Health Order requires masks to be worn in all indoor public spaces including all City facilities.
Daily Road Report - November 1, 2021
October 29, 2021 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
TAYLOR ST E SB SHOULDER LANE CLOSED AT CIRCLE DR E
(Landscaping)
Start: November 1, 7:00 a.m. End: November 4, 5:00 p.m.
MARQUIS DR EB RAMP CLOSED TO IDYLWYLD DR SB
(Storm main repairs)
Start: November 1, 8:00 a.m. End: November 2, 6:00 p.m.
ONGOING
NEAULT RD NB LANES CLOSED FROM 22ND ST W TO 33RD ST W
(Water main construction)
Temporary traffic lights allowing alternating traffic flow
Start: September 20, 10:00 a.m. End: November 1, 5:00 p.m.
TAYLOR ST E ROAD CLOSED MEADOWS PKY
(Construction)
Start: October 23, 9:00 a.m. End: November 3, 4:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM 8TH ST TO BRIGHTON COMMON
(Storm sewer work)
Start: August 30, 9:00 a.m. End: November 5, 7:00 a.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Weekend Road Report - October 30-31, 2021
October 29, 2021 - 2:30pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
1ST AVE N INTERSECTION CLOSED AT QUEEN ST
(Catch basin lead repair)
Start: October 30, 8:00 a.m. End: October 30, 5:00 p.m.
VICTORIA AVE NB LANES CLOSED FROM 11TH ST E TO SPADINA CRES E
(Cable pull)
Start: October 31, 5:00 a.m. End: October 31, 1:00 p.m.
ONGOING
8TH ST E INTERSECTION CLOSED AT NEW MCORMOND DR
(Construction)
Start: April 26, 7:00 a.m. End: October 30, 9:00 a.m.
CUMBERLAND AVE S ROAD CLOSED FROM BUTE ST TO MCLORG ST
(Catch basin work)
Start: October 29, 8:00 a.m. End: October 30, 4:00 p.m.
MCKERCHER DR VARIOUS NB & SB LANES CLOSED FROM 8TH ST E TO EDINBURGH PL
(Crosswalk blasting)
Start: October 28, 7:00 a.m. End: October 31, 5:00 p.m.
NEAULT RD NB LANES CLOSED FROM 22ND ST W TO 33RD ST W
(Water main construction)
Temporary traffic lights allowing alternating traffic flow
Start: September 20, 10:00 a.m. End: November 1, 5:00 p.m.
TAYLOR ST E ROAD CLOSED MEADOWS PKY
(Construction)
Start: October 23, 9:00 a.m. End: November 3, 4:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM 8TH ST TO BRIGHTON COMMON
(Storm sewer work)
Start: August 30, 9:00 a.m. End: November 5, 7:00 a.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
City waste diversion programs set to wrap up after another successful season
October 29, 2021 - 11:00am
- The final HHW Drop-off Day of 2021 is scheduled for Sunday, November 7 (9:00 a.m.–3:30 p.m.) at the Civic Operations Centre (57 Valley Road).
- Approximate wait times will be posted periodically on the day of the event on the Facebook event page.
- Event staff are prepared to accommodate a high volume of traffic, although residents are reminded to consider other means of safe disposal for the more common household hazardous items (e.g. batteries, light bulbs, paint, used engine oil) to avoid the long line-up and wait time. Residents are encouraged to visit saskatoon.ca/wastewizard or get the Saskatoon Waste Wizard app to search an item for recycling and disposal information.
- More information, including acceptable items and COVID-19 guidelines are available at saskatoon.ca/hhw
- Final collections for Green Cart subscribers will happen November 1–5. All subscribers will receive a bonus Green Cart collection on their scheduled pickup day, regardless of when their previous collection was performed. Carts should be placed at the curb by 7:00 a.m. to ensure successful collection.
- Renewal and registration for the 2022 season will begin on January 4, 2022 at saskatoon.ca/greencart.
- Both the East and West Compost Depots will remain open until Saturday, November 6 for any excess yard waste that may not fit in residential Green Carts.
- The Compost Depots will then close for the winter season and re-open in April 2022.
- This will also be the last chance to take advantage of compost and mulch at the West Compost Depot; available for bulk purchase and at no charge for Dig-Your-Own customers.
- For more information, please visit saskatoon.ca/compostdepots
The City of Saskatoon will be wrapping up some of its increasingly popular waste diversion programs for the 2021 season.
Household Hazardous Waste Drop-off
The HHW Drop-off program had another great year, averaging 466 participants per event and receiving a total of 135,015 kg of hazardous waste to date. The most recent event held on October 3 had a record 710 participants.
Subscription Green Cart Program
Over 1,500 new subscribers joined the program this year bringing the total to 11,915 curbside households. This helped the City divert approximately 3.3 million kg of food and yard waste from the landfill.
Compost Depots
The two compost depots have welcomed over 64,000 vehicles this season. The west depot shredded approximately 3000 tonnes of wood into mulch and produced approximately 7,500 tonnes of finished screened compost that will be made available to Saskatoon parks, community gardens, the Dig-Your-Own program, and for bulk purchase.
The City would like to thank residents for diverting their organic and hazardous waste from the landfill and helping Saskatoon move closer to its 70% waste diversion target.
1st Avenue closed between King and Queen streets starting Saturday
October 29, 2021 - 9:00am
1st Avenue will be closed between King and Queen streets starting Saturday, October 30, at 8:00 a.m. for catch basin work. Detours will be in place guiding motorists around this work. This project is expected to take 10 hours to complete, barring any unforeseen circumstances or weather delays.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information is available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Marquis Drive southbound exit ramp to Idylwyld Drive closed starting Monday
October 29, 2021 - 8:00am
The Marquis Drive southbound exit ramp to Idylwyld Drive will be closed starting Monday, November 1 at 8:00 a.m. for storm main repair work. Detours will be in place guiding motorists around this work. This project is expected to take two days to complete, barring unforeseen circumstances or weather delays.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information is available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
1st Avenue intersection closed at Princess Street on Saturday
October 29, 2021 - 7:00am
The intersection at 1st Avenue and Princess Street will be closed on Saturday, October 30, at 8:00 a.m. for manhole repair work. Princess Street will be closed between 2nd Avenue and City Yards during this project. Detours will be in place guiding motorists around this work. This project is expected to take one day to complete, barring any unforeseen circumstances or weather delays.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information is available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Daily Road Report - October 29, 2021
October 28, 2021 - 7:53am
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
CUMBERLAND AVE S ROAD CLOSED FROM BUTE ST TO MCLORG ST
(Catch basin work)
Start: October 29, 8:00 a.m. End: October 30, 4:00 p.m.
22ND ST W WB MEDIAN LANE & NEXT LANE CLOSED AT AVE U N
(Storm sewer monitoring)
Start: October 29, 10:00 a.m. End: October 29, 11:00 a.m.
ONGOING
BRIGHTON BLVD ROAD CLOSED FROM 8TH ST TO BRIGHTON COMMON
(Storm sewer work)
Start: August 30, 9:00 a.m. End: October 31, 7:00 a.m.
MCKERCHER DR VARIOUS NB & SB LANES CLOSED FROM 8TH ST E TO EDINBURGH PL
(Crosswalk blasting)
Start: October 28, 7:00 a.m. End: October 31, 5:00 p.m.
NEAULT RD NB LANES CLOSED FROM 22ND ST W TO 33RD ST W
(Water main construction)
Temporary traffic lights allowing alternating traffic flow
Start: September 20, 10:00 a.m. End: November 1, 5:00 p.m.
TAYLOR ST E ROAD CLOSED MEADOWS PKY
(Construction)
Start: October 23, 9:00 a.m. End: November 3, 4:00 p.m.
8TH ST E INTERSECTION CLOSED AT NEW MCORMOND DR
(Construction)
Start: April 26, 7:00 a.m. End: November 5, 9:00 a.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
New map highlights areas affected by SL&P power outages
October 28, 2021 - 2:00pm
Saskatoon Light & Power (SL&P) has launched a new interactive power outage map, making it easier than ever for customers to access and view outage information.
“While our crews are troubleshooting and repairing an outage, we’re committed to keeping customers informed in the easiest, most helpful way,” says Trevor Bell, Director of SL&P. “Service alerts issued on Twitter and on the City website are the primary form of communication for outages, but now the map will also be included with the alerts making it easier to see the area impacted, cause, and estimated time of repair.”
Outages are either identified from data notification from the electrical system (i.e. smart meters) or through calls from customers. Crews are then dispatched to determine the cause of the outage, and then isolate the issue and complete the repair. Outages may involve minor work, such as trimming trees away from power lines, or much larger tasks such as replacing broken poles, faulty cables, or damaged transformers. Repair work can take minutes or up to several hours.
“Prior to the power outage map, the impacted outage area was written in a service alert, but since the outage area usually does not follow neighbourhood boundaries it can be difficult to describe the affected area accurately,” says Bell. “While the written information will still be provided, the new map will be a better visual representation of the outage area and will be especially helpful in the event of planned outages.”
Bell adds that Saskatoon Light & Power’s index of reliability in 2020 was 0.9998, which means that power was delivered to the average customer 99.98% of the time.
Saskatoon Light & Power provides power to over 60,000 properties within its service area. All customers outside of the service area should refer to the SaskPower website for any outage related information.
Visit saskatoon.ca/outages for more information on the new power outage map and for power outage tips.
Special event bus service
October 28, 2021 - 10:00am
- 5:45 p.m.
- 6:25 p.m.
Direct service from the Special Events Stop (outside the 2nd Avenue Lofts at 23rd Street and 2nd Avenue) to experience the 2021 PBR Canadian Finals at SaskTel Centre on Friday, October 29 and Saturday, October 30, is available at the following times each day:
Post event drop-off is the downtown terminal and regular fares apply ($3.00 per trip). Transfers and passes are also accepted.
Plan your trip to events at SaskTel Centre on Route 333 using the Transit app up to two weeks in advance! Check out the Transit+ feature that helps you make connections that combine Transit with ridehail providers like riide and Uber. Transit does the work so you can travel with ease! Download the Transit app from the Apple Store or Google Play.
To protect the health and safety of residents, customers and employees, masks are required when traveling on Saskatoon Transit and when accessing indoor City-operated facilities and services as an added safety measure to address the increasing spread of COVID-19 in our community.
Transit service times for special events at SaskTel Centre and other popular destinations can always be found at SaskatoonTransit.ca/plan-my-trip/popular-destinations. Experience the convenience of using Saskatoon Transit to attend all your favourite events.
Cumberland Avenue closed between Bute and McLorg streets starting Friday
October 28, 2021 - 7:00am
Cumberland Avenue will be closed between Bute and McLorg streets starting Friday, October 29, at 7:00 a.m. for catch basin replacement work. Cascade Street will be closed between Ewart and Irvine avenues during this project. Detours will be in place guiding motorists around this work. This project is expected to take two days to complete, barring any unforeseen circumstances or weather delays.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information is available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Daily Road Report - October 28, 2021
October 27, 2021 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
MCKERCHER DR NB PARKING LANE & SIDEWALK CLOSED FROM EDINBURGH PL TO BALFOUR ST
(Paving)
Start: October 28, 7:00 a.m. End: October 28, 5:00 p.m.
MCKERCHER DR VARIOUS NB & SB LANES CLOSED FROM 8TH ST E TO EDINBURGH PL
(Crosswalk blasting)
Start: October 28, 7:00 a.m. End: October 31, 5:00 p.m.
ATTRIDGE DR EB &WB MEDIAN LANES CLOSED FROM CIRCLE DR E TO CENTRAL AVE
(Streetlight connection work)
Start: October 28, 9:00 a.m. End: October 28, 3:00 p.m.
3RD AVE S NB LANES CLOSED FROM 20TH ST E TO 21ST ST E
(Transformer change)
Start: October 28, 6:00 p.m. End: October 28, 8:00 p.m.
ONGOING
IDYLWYLD DR N NB & SB SPEED REDUCTION FROM 46TH ST E TO 51ST ST E
(Fence repairs)
Start: October 27, 9:00 a.m. End: October 28, 3:00 p.m.
IDYLWYLD DR N NB LANES CLOSED FROM 25TH ST E TO 27TH ST W
(Water Main Repair)
Two-Way traffic will be maintained in the SB lanes
Start: October 27, 6:00 a.m. End: October 28, 4:00 p.m.
CENTRAL AVE NB/SB MEDIAN LANES CLOSED FROM SOMERS RD TO AGRA RD
(Concrete median repairs)
Start: October 25, 9:00 a.m. End: October 28, 4:00 p.m.
MCORMOND DR NB/SB MEDIAN LANES CLOSED NEAR SOUTH GRID RD
(Concrete median repairs)
Start: October 25, 9:00 a.m. End: October 28, 4:00 p.m.
RUTH ST E ROAD CLOSED FROM EWART AVE TO IRVINE AVE
(Water main repair)
Start: October 26, 8:00 a.m. End: October 28, 4:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM 8TH ST TO BRIGHTON COMMON
(Storm sewer work)
Start: August 30, 9:00 a.m. End: October 31, 7:00 a.m.
8TH ST E INTERSECTION CLOSED AT NEW MCORMOND DR
(Construction)
Start: April 26, 7:00 a.m. End: October 31, 7:00 a.m.
NEAULT RD NB LANES CLOSED FROM 22ND ST W TO 33RD ST W
(Water main construction)
Temporary traffic lights allowing alternating traffic flow
Start: September 20, 10:00 a.m. End: November 1, 5:00 p.m.
TAYLOR ST E ROAD CLOSED AT MEADOWS PKY
(Construction)
Start: October 23, 9:00 a.m. End: November 3, 4:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
City invites feedback on draft Strategic Plan 2022-2025
October 27, 2021 - 5:13am
- Advance City Council's Priorities
- Deliver Excellence in Core Services and Operational Priorities
- Drive Corporate Transformational Change
The City is seeking public input on its draft Strategic Plan for 2022-2025. The current Strategic Plan for 2018-2021 will be retired at year’s end.
The City has been working to develop the new strategic plan over the course of the past year. The document is intended to capture the priorities and direction for the City over the next four years. The draft plan includes three pillars that underline how the City will achieve the goals set out in its plan:
Why do we need a Strategic Plan?
The Strategic Plan is a guiding document that sets out the City’s big picture. It outlines the specific outcomes that City Council and Administration will work together to achieve over the next four years. Strategy does not cover all the important work a City does. Strategy speaks specifically to the changes and improvements that are planned over a period to ensure Saskatoon remains a city that residents are proud to call home.
Public Input
The City is gathering feedback on the draft plan and content of the three pillars. This feedback will be presented alongside the plan at the Nov. 22nd meeting of City Council. The Strategic Plan presentation and the discussion that follows will be available via livestream at saskatoon.ca and residents are welcome to tune in.
The 2022-2025 draft Strategic Plan and the accompanying survey are available now at saskatoon.ca/engage. If you or someone you know cannot complete the online survey, please contact the City's Customer Care Centre at 306-975-2476 to request a paper copy. The survey is open until 5 p.m. on Nov. 10, 2021.
Daily Road Report - October 27, 2021
October 26, 2021 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
20TH ST W EB & SB LANES CLOSED AT AVE X S
(Patching)
Start: October 27, 7:00 a.m. End: October 27, 5:00 p.m.
IDYLWYLD DR N NB & SB SPEED REDUCTION FROM 46TH ST E TO 51ST ST E
(Fence repairs)
Start: October 27, 9:00 a.m. End: October 28, 3:00 p.m.
CIRCLE DR W SB CURB LANE CLOSED AT 33RD ST W
(Minor bridge repairs)
Start: October 27, 9:00 a.m. End: October 29, 3:00 p.m.
ONGOING
BOYCHUK DR INTERSECTION CLOSED AT BRANDON PL
(Channelization)
Start: October 19, 7:00 a.m. End: October 27, 5:00 p.m.
CENTRAL AVE ROAD CLOSED FROM 107TH ST W TO 106TH ST W
(Connection replacement)
Start: October 26, 8:00 a.m. End: October 27, 5:00 p.m.
CENTRAL AVE NB/SB MEDIAN LANES CLOSED FROM SOMERS RD TO AGRA RD
(Concrete median repairs)
Start: October 25, 9:00 a.m. End: October 28, 4:00 p.m.
MCORMOND DR NB/SB MEDIAN LANES CLOSED NEAR SOUTH GRID RD
(Concrete median repairs)
Start: October 25, 9:00 a.m. End: October 28, 4:00 p.m.
RUTH ST E ROAD CLOSED FROM EWART AVE TO IRVINE AVE
(Water main repair)
Start: October 26, 8:00 a.m. End: October 28, 4:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM 8TH ST TO BRIGHTON COMMON
(Storm sewer work)
Start: August 30, 9:00 a.m. End: October 31, 7:00 a.m.
8TH ST E INTERSECTION CLOSED AT NEW MCORMOND DR
(Construction)
Start: April 26, 7:00 a.m. End: October 31, 7:00 a.m.
NEAULT RD NB LANES CLOSED FROM 22ND ST W TO 33RD ST W
(Water main construction)
Temporary traffic lights allowing alternating traffic flow
Start: September 20, 10:00 a.m. End: November 1, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
City proclaims November 1 to 8 Health Care Worker Appreciation Week: 40% discount offered at City Indoor Leisure Centres
October 25, 2021 - 4:30pm
City Council today proclaimed November 1 to 8, 2021, Health Care Worker Appreciation Week in Saskatoon.
“On behalf of the City of Saskatoon, Saskatoon City Council extends its sincere gratitude and appreciation to all health care workers who continue to show heroic efforts in protecting our community during the COVID-19 pandemic,” says Mayor Charlie Clark.
In appreciation for all the physicians, nurses, health care aides, home care providers, pharmacists, paramedics, emergency management teams and all others working in health care, the City is offering a 40% discount on a family, adult or youth Leisure Centre general admission during Health Care Worker Appreciation Week -- November 1 to 8, 2021.
In addition to the required vaccination or negative test proof, health care workers will be asked to provide proof of employment in order to receive the discount. The offer is valid at all City Leisure Centres including Cosmo Civic Centre, Harry Bailey Aquatic Centre, Lakewood Civic Centre, Lawson Civic Centre, Saskatoon Field House and Shaw Centre.
For more information, visit saskatoon.ca/leisurecentres.
Daily Road Report - October 26, 2021
October 25, 2021 - 3:55am
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
8TH ST E WB PARKING LANE & CURB LANE CLOSED FROM BROADWAY AVE TO EASTLAKE AVE
(Valve upgrade)
Start: October 26, 7:00 a.m. End: October 26, 7:00 p.m.
CENTRAL AVE ROAD CLOSED FROM 107TH ST W TO 106TH ST W
(Connection replacement)
Start: October 26, 8:00 a.m. End: October 27, 5:00 p.m.
RUTH ST E ROAD CLOSED FROM EWART AVE TO IRVINE AVE
(Water main repair)
Start: October 26, 8:00 a.m. End: October 28, 4:00 p.m.
BALTZAN BLVD EB LANES CLOSED FROM MCORMOND DR TO BOYKOWICH CRES
(Sewer inspection)
Start: October 26, 9:00 a.m. End: October 26, 12:00 p.m.
CIRCLE DR E NB MEDIAN LANE CLOSED FROM COLLEGE DR TO 108TH ST W
(Streetlight repairs)
Start: October 26, 9:00 a.m. End: October 26, 3:00 p.m.
3RD AVE S NB LANES CLOSED FROM 20TH ST E TO 21ST ST E
(Transformer change)
Start: October 26, 6:00 p.m. End: October 26, 8:00 p.m.
ONGOING
33RD ST W FOUR-WAY STOP AT CONFEDERATION DR
(Intersection improvements)
Start: October 25, 9:00 a.m. End: October 26, 3:00 p.m.
BOYCHUK DR INTERSECTION CLOSED AT BRANDON PL
(Channelization)
Start: October 19, 7:00 a.m. End: October 27, 5:00 p.m.
CENTRAL AVE NB/SB MEDIAN LANES CLOSED FROM SOMERS RD TO AGRA RD
(Concrete Median Repairs)
Start: October 25, 9:00 a.m. End: October 28, 4:00 p.m.
MCORMOND DR NB/SB MEDIAN LANES CLOSED NEAR SOUTH GRID RD
(Concrete Median Repairs)
Start: October 25, 9:00 a.m. End: October 28, 4:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM 8TH ST TO BRIGHTON COMMON
(Storm sewer work)
Start: August 30, 9:00 a.m. End: October 31, 7:00 a.m.
8TH ST E INTERSECTION CLOSED AT NEW MCORMOND DR
(Construction)
Start: April 26, 7:00 a.m. End: October 31, 7:00 a.m.
NEAULT RD NB CLOSED FROM 22ND ST W TO 33RD ST W
(Water main construction)
Temporary traffic lights allowing alternating traffic flow
Start: September 20, 10:00 a.m. End: November 1, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Ruth Street closed between Ewart and Irvine avenues starting Tuesday
October 25, 2021 - 11:30am
Ruth Street will be closed between Ewart and Irvine avenues starting Tuesday, October 26, at 8:00 a.m. for water main work. Cumberland Avenue will be closed between Adelaide and Bute streets during this project. Detours will be in place guiding motorists around the work zone. This project is expected to take three days to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information is available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
2021 road, water main and sidewalk construction wrapping up
October 25, 2021 - 10:00am
Travelling on College Drive from Central Avenue eastbound to the edge of the city is a much smoother experience, thanks to a four-week long road resurfacing project over the summer. Laying new asphalt on that stretch to improve the condition and make it longer lasting was one of the most significant initiatives undertaken by the City during the 2021 construction season.
“Several of our road projects finished earlier than expected and we had more time to finish others, due to a very dry summer and above average temperatures that extended into the fall,” says Terry Schmidt, General Manager of Transportation and Construction. “Overall, work was generally steady and uninterrupted, and we were able to improve approximately 207 kilometers of roads this year.”
In addition to College Drive and the rehabilitation of the Circle Drive overpass at 8th Street, which finished early, Schmidt says road construction took place following water main replacements in neighbourhoods like Caswell Hill and Nutana.
“We replace water mains and service connections at the same time. The roads excavated during that work are then completely resurfaced and repaved from curb-to-curb.”
Approximately 22 kilometers of water mains and sanitary sewer mains were replaced or rehabilitated in 2021 – about the distance from Saskatoon to Martensville.
Sidewalk improvements are just as important as road maintenance every year. City departments have been working collaboratively to make significant improvements to the management and execution of the Sidewalk Repair Program. So far in 2021, crews have repaired or rehabilitated approximately 28 kilometers of sidewalks and curbs. That work will continue for as long as the weather allows this fall.
Significant progress has been made on Saskatoon roads, sidewalks and water mains in recent years and the City of Saskatoon thanks residents for their patience and cooperation.
For more 2021 construction highlights, please see the attached infographics or visit saskatoon.ca/construction.
Central Avenue closed between 106th and 107th streets starting Tuesday
October 25, 2021 - 9:00am
Central Avenue will be closed between 106th and 107th streets starting Wednesday, October 26, at 8:00 a.m. for connection replacement work. Detours will be in place guiding motorists around this project. This project is expected to take two days to complete, barring any unforeseen circumstances or weather delays.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information is available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Daily Road Report - October 25, 2021
October 22, 2021 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
NELSON RD EB CRUB LANE CLOSED FROM LOWE RD TO HEAL AVE
(Concrete pumping)
Start: October 25, 6:00 a.m. End: October 25, 6:00 p.m.
FEHEREGHAZI BLVD CLOSED FROM FAST CRES TO BOLSTAD LINK
(Roadway patching)
Start: October 25, 7:00 a.m. End: October 25, 5:00 p.m.
8TH ST E WB CURB LANE CLOSED FROM MELROSE AVE TO MCPHERSON AVE
(Gas valve removal)
Start: October 25, 7:00 a.m. End: October 25, 7:00 p.m.
33RD ST W FOUR-WAY STOP AT CONFEDERATION DR
(Intersection improvements)
Start: October 25, 9:00 a.m. End: October 26, 3:00 p.m.
CENTRAL AVE NB/SB MEDIAN LANES CLOSED FROM SOMERS RD TO AGRA RD
(Concrete Median Repairs)
Start: October 25, 9:00 a.m. End: October 28, 4:00 p.m.
MCORMOND DR NB/SB MEDIAN LANES CLOSED NEAR SOUTH GRID RD
(Concrete Median Repairs)
Start: October 25, 9:00 a.m. End: October 28, 4:00 p.m.
ONGOING
COLLEGE DR EB CURB LANE & SHOULDER CLOSED FROM MCKERCHER DR TO PETERS COVE
(Roadwork)
Start: October 12, 7:00 a.m. End: October 25, 4:00 p.m..
TAYLOR ST E ROAD CLOSED FROM ROSEWOOD GATE TO MEADOWS PKY
(Construction)
Start: October 23, 9:00 a.m. End: October 25, 5:00 p.m.
20TH ST E INTERSECTION CLOSED AT 2ND AVE S
(Water main repair)
Start: October 24, 7:00 a.m. End: October 25, 5:00 p.m.
2ND AVE S ROAD CLOSED FROM 21ST ST TO 19TH ST
(Water main repair)
Start: October 24, 7:00 a.m. End: October 25, 5:00 p.m.
BOYCHUK DR INTERSECTION CLOSED AT BRANDON PL
(Channelization)
Start: October 19, 7:00 a.m. End: October 27, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM 8TH ST TO BRIGHTON COMMON
(Storm sewer work)
Start: August 30, 9:00 a.m. End: October 31, 7:00 a.m.
8TH ST E INTERSECTION CLOSED AT NEW MCORMOND DR
(Construction)
Start: April 26, 7:00 a.m. End: October 31, 7:00 a.m.
NEAULT RD NB CLOSED FROM 22ND ST W TO 33RD ST W
(Water main construction)
Temporary traffic lights allowing alternating traffic flow
Start: September 20, 10:00 a.m. End: November 1, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
Weekend Road Report - October 23-24, 2021
October 22, 2021 - 2:30pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
COLLEGE DR EB LANES CLOSED FROM UNIVERSITY DR TO WIGGINS AVE N
(Valve repair)
Two-way traffic will be maintained in the WB lanes.
Start: October 23, 8:00 a.m. End: October 24, 5:00 p.m.
TAYLOR ST E ROAD CLOSED FROM ROSEWOOD GATE TO MEADOWS PKY
(Construction)
Start: October 23, 9:00 a.m. End: October 25, 5:00 p.m.
3RD AVE N NB & SB MEDIAN LANES CLOSED FROM 22ND ST E TO 23RD ST E
(Roadway patching)
Start: October 24, 7:00 a.m. End: October 24, 5:00 p.m.
CLARENCE AVE N SB LANES CLOSED FROM UNIVERSITY DR TO TEMPERANCE ST
(Roadway patching)
Start: October 24, 7:00 a.m. End: October 24, 5:00 p.m.
20TH ST E INTERSECTION CLOSED AT 2ND AVE S
(Water main repair)
Start: October 24, 7:00 a.m. End: October 25, 5:00 p.m.
2ND AVE S ROAD CLOSED FROM 21ST ST E TO 22ND ST E
(Coil lift)
Start: October 24, 7:30 a.m. End: October 24, 11:30 a.m.
2ND AVE S ROAD CLOSED FROM 21ST ST TO 19TH ST
(Water main repair)
Start: October 24, 7:00 a.m. End: October 25, 5:00 p.m.
ONGOING
COLLEGE DR EB CURB LANE & SHOULDER CLOSED FROM MCKERCHER DR TO PETERS COVE
(Roadwork)
Start: October 12, 7:00 a.m. End: October 25, 4:00 p.m.
BOYCHUK DR INTERSECTION CLOSED AT BRANDON PL
(Channelization)
Start: October 19, 7:00 a.m. End: October 27, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM 8TH ST TO BRIGHTON COMMON
(Storm sewer work)
Start: August 30, 9:00 a.m. End: October 31, 7:00 a.m.
8TH ST E INTERSECTION CLOSED AT NEW MCORMOND DR
(Construction)
Start: April 26, 7:00 a.m. End: October 31, 7:00 a.m.
NEAULT RD NB LANES CLOSED FROM 22ND ST W TO 33RD ST W
(Water main construction)
Temporary traffic lights allowing alternating traffic flow
Start: September 20, 10:00 a.m. End: November 1, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
2nd Avenue closed between 19th and 21st streets starting Sunday
October 22, 2021 - 11:00am
2nd Avenue will closed between 19th and 21st streets starting Sunday, October 24, at 7:00 a.m. for water main work. 20th Street will be closed between 1st and 3rd avenues during this project. Detours will be in place guiding motorists around the work zone. This project is expected to take two days to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information is available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Bus service to see Eric Church
October 22, 2021 - 10:00am
- 6:45 p.m.
- 7:05 p.m.
- 7:25 p.m.
- 7:45 p.m.
Direct service from the Special Events Stop (outside the 2nd Avenue Lofts at 23rd Street and 2nd Avenue) to see Eric Church at SaskTel Centre on Saturday, October 23, is available at the following times:
Post event drop-off is the downtown terminal and regular fares apply ($3.00 per trip). Transfers and passes are also accepted.
Plan your trip to events at SaskTel Centre on Route 333 using the Transit app up to two weeks in advance! Check out the Transit+ feature that helps you make connections that combine Transit with ridehail providers like riide and Uber. Transit does the work so you can travel with ease! Download the Transit app from the Apple Store or Google Play.
To protect the health and safety of residents, customers and employees, masks are required when traveling on Saskatoon Transit and when accessing indoor City-operated facilities and services as an added safety measure to address the increasing spread of COVID-19 in our community.
Transit service times for special events at SaskTel Centre and other popular destinations can always be found at SaskatoonTransit.ca/plan-my-trip/popular-destinations. Experience the convenience of using Saskatoon Transit to attend all your favourite events.
Fehereghazi Boulevard closed between Bolstad Link and Fast Crescent on Monday
October 22, 2021 - 9:00am
Fehereghazi Boulevard will be closed between Bolstad Link and Fast Crescent on Monday, October 25 at 7:00 a.m. for roadway patching work. Detours will be in place guiding motorists around this work. This project is expected to take 10 hours to complete, barring unforeseen circumstances or weather delays.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information is available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Taylor Street closed between Meadows Parkway and Rosewood Gate starting Saturday
October 22, 2021 - 8:00am
Taylor Street will be closed between Meadows Parkway and Rosewood Gate starting Saturday, October 23, at 9:00 a.m. for roadway work. Taylor Street will remain open between Meadows Parkway and Wess Road to provide access to the Meadows Market and Costco areas. Detours will be in place guiding motorists around this work. This project is expected to take three days to complete, barring any unforeseen circumstances or weather delays.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information is available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
2nd Avenue closed between 21st and 22nd streets on Sunday
October 22, 2021 - 7:00am
2nd Avenue will be closed between 21st and 22nd streets on Sunday, October 24, at 7:30 a.m. for craning work. Detours will be in place guiding motorists around this work. This project is expected to take four hours to complete, barring any unforeseen circumstances or weather delays.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information is available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Daily Road Report - October 22, 2021
October 21, 2021 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
ATTRIDGE DR WB CURB LANE CLOSED FROM FORESTRY FARM PARK DR TO REVER RD
(Roadway patching)
Start: October 22, 8:00 a.m. End: October 22, 11:00 a.m.
TAYLOR ST E EB & WB DRIVING LANES CLOSED FROM LOUISE AVE TO PARK AVE
(Valve repair)
Traffic will be maintained in the parking lanes.
Start: October 22, 9:00 a.m. End: October 22, 5:30 a.m.
CIRCLE DR S WB CURB & CENTRE LANES CLOSED FROM LORNE AVE TO VALLEY RD
(Repairs)
Start: October 22, 9:00 a.m. End: October 22, 3:00 p.m.
2ND AVE S SB LANES CLOSED FROM 20TH ST E TO 19TH ST E
(Roadway patching)
Start: October 22, 9:00 a.m. End: October 22, 3:00 p.m.
IDYLWYLD DR N SB CURB LANE CLOSED FROM 45TH ST W TO CIRCLE DR E
(Roadway patching)
Start: October 22, 11:00 a.m. End: October 22, 1:00 p.m.
ONGOING
20TH ST W EB & WB CLOSED FROM AVE W S TO AVE Y S
(Valve replacement)
Start: October 21, 8:00 a.m. End: October 22, 4:00 p.m.
COLLEGE DR EB CURB LANE & SHOULDER CLOSED FROM MCKERCHER DR TO PETERS COVE
(Roadwork)
Start: October 12, 7:00 a.m. End: October 25, 4:00 p.m.
NEAULT RD NB LANES CLOSED FROM 22ND ST W TO 33RD ST W
(Water main construction)
Temporary traffic lights allowing alternating traffic flow
Start: September 20, 10:00 a.m. End: October 25, 5:00 p.m.
BOYCHUK DR INTERSECTION CLOSED AT BRANDON PL
(Channelization)
Start: October 19, 7:00 a.m. End: October 27, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM 8TH ST TO BRIGHTON COMMON
(Storm sewer work)
Start: August 30, 9:00 a.m. End: October 31, 7:00 a.m.
8TH ST E INTERSECTION CLOSED NEW MCORMOND DR
(Construction)
Start: April 26, 7:00 a.m. End: October 31, 7:00 a.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Update: Free events for youth on Friday, November 12, 2021
October 20, 2021 - 10:31am
- Proof of vaccination and ID for those eligible (12 and over) is required. Note: Photo ID is not required for anyone under 17 years. Acceptable ID is copy of any government issued identification such as Saskatchewan Health Card, Birth Certificate, and Passport or a Student ID.
- Masks will be mandatory for all participants inside the facility and during all activities.
- Equipment will be sanitized after every use.
- Proper food handling protocols will be followed.
- Physical distancing will be in place.
Registration is now open for Girls in Motion and for Taking to the Court – free events being hosted by the City of Saskatoon on Friday, November 12, 2021, for youth
ages 10 to 14.
Girls in Motion
Friday, November 12
9 a.m. to 4 p.m.
Saskatoon Soccer Centre, 150 Nelson Road
A day for youth to become inspired to live a healthy, happy lifestyle and enjoy physical activities. This year’s sessions include zumba, gymnastics, hoop dancing, self defence, ballet/jazz and yoga.
Taking to the Court
Friday, November 12
9 a.m. to 4 p.m.
Cosmo Civic Centre, 3130 Laurier Drive
A day for youth to get active and have fun learning futsal and box lacrosse.
Lunch and snacks are provided at each event. Space is limited. Register online at leisureonline.saskatoon.ca or call or visit any Leisure Centre by Monday, November 8.
Know before you go! The following COVID-19 safety protocols will be in place to ensure the safety of staff and participants: